30 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Semirigid Cables Required for Upgrading to an Option 419 PNA
To see images showing the location of these cables, click the Chapter 6
bookmark “Bottom RF Cables, 4-Port, Option 419” in the PDF Service Guide
1
.
New parts are listed in
— Follow the two instructions shown in
in this document.
Figure 12
Semirigid Cables Installation
— W96 (N5245-20087)A45 port 2 bias tee to port 2 CPLR THRU
— W92 (N5245-20088)A44 port 4 bias tee to A35 port 4 coupler
— W84 (N5245-20085)A42 port 1 bias tee to A33 port 1 coupler
— W88 (N5245-20086)A43 port 3 bias tee to A34 port 3 coupler
— W25 (N5245-20116)A30 port 3 ref coupler to front-panel REF 3 SOURCE
, install clamp part number 1400-1334 to secure
W25.
1. See