Installation Note N9010-90041
23
Option EXM, External Mixing Upgrade Kit
Final Installation for Standard Instruments
Appendix Figure 1, “Instrument Outer Case Removal,”
1.
Refer to Appendix Figure 1, “Instrument Outer Case Removal,”. Carefully slide the instrument
cover back onto the instrument from the rear of the analyzer, making sure not to damage any
internal cables. The seam on the cover should be on the bottom of the instrument. Be sure the
cover seats into the gasket groove in the Front Frame Assembly.
2.
Replace the four rear feet
(4)
to the rear of the instrument using the four screws
(3)
. Torque
to 21 inch pounds.
3.
Replace the strap handles
(2)
on both sides of the instrument using the four screws
(1)
.
Torque to 21 inch pounds.
4.
Replace the four instrument bottom feet.
5.
Replace the four key locks to the bottom feet.
Final Installation for Portable Instruments
(Option PRC,
Appendix Figure 2, “Bail Handle Removal,”
Appendix Figure 3, “Option PRC
1.
Refer to Appendix Figure 3, “Option PRC Outer Case Removal,”. Carefully slide the instrument
cover back onto the instrument from the rear of the analyzer, making sure not to damage any
internal cables. The seam on the cover should be on the bottom of the instrument. Be sure the
cover seats into the gasket groove in the Front Frame Assembly.
2.
Refer to Appendix Figure 3, “Option PRC Outer Case Removal,”. Replace the four rear bumpers
(2)
to the rear of the instrument using the four screws
(1)
. Torque to 21 inch pounds.
3.
Refer to Appendix Figure 2, “Bail Handle Removal,”. Replace the four hole plugs
(5)
to both
sides of the instrument.
4.
Refer to Appendix Figure 2, “Bail Handle Removal,”. Replace the bail handle
(2)
(using the
four screws
(1)
) to the Front Frame Assembly. Torque to 21 inch pounds.