Keysight Technologies E4982A Скачать руководство пользователя страница 8

6

LCR Meter

Regulatory Compliance Information

This product complies with the essential requirements of the 
following applicable European Directives, and carries the CE 
marking accordingly:

The Low Voltage Directive 2006/95/EC

The EMC Directive 2004/108/EEC

To obtain Declaration of Conformity, please contact your 
local Keysight Technologies sales office, agent or distributor.

Содержание E4982A

Страница 1: ...Keysight E4982A LCR Meter Installation Guide Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 2: ......

Страница 3: ......

Страница 4: ...material in this document that conflict with these terms the warranty terms in the separate agreement shall control Technology Licenses The hardware and or software described in this document are fur...

Страница 5: ...e the highly sensitive microcircuits in your instrument ESD damage is most likely to occur as the test fixtures are being connected or disconnected Protect them from ESD damage by wearing a grounding...

Страница 6: ...epair of the instrument If you continue to operate without repairing the instrument there is a potential fire or shock hazard to the operator Instrument operates abnormally Instrument emits abnormal n...

Страница 7: ...Declaration Herstellerbescheinigung GERA USCHEMISSION LpA 70 dB am Arbeitsplatz normaler Betrieb nach DIN 45635 T 19 Manufacturer s Declaration ACOUSTIC NOISE EMISSION LpA 70 dB operator position nor...

Страница 8: ...requirements of the following applicable European Directives and carries the CE marking accordingly The Low Voltage Directive 2006 95 EC The EMC Directive 2004 108 EEC To obtain Declaration of Confor...

Страница 9: ...ns This equipment is a POLLUTION DEGREE 2 INDOOR USE product This equipment is tested in stand alone condition and in combination with the accessories supplied by Keysight Technologies against the req...

Страница 10: ...or fumes Operation of any electrical instrument in such an environment clearly constitutes a safety hazard Keep Away from Live Circuits Operators must not remove instrument covers Component replaceme...

Страница 11: ...ervice and repair to ensure that safety features are maintained in operational condition Dangerous Procedure Warnings Warnings such as the example below precede potentially dangerous procedures throug...

Страница 12: ...ent s chassis which includes all exposed metal structure Standby WARNING This warning sign denotes a hazard It calls attention to a procedure practice or condition that if not correctly performed or a...

Страница 13: ...ted to the implied warranties of merchantability and fitness for a particular purpose Keysight shall not be liable for errors or for incidental or consequential damages in connection with the furnishi...

Страница 14: ...he quick start measurement operation programming handler interface This is pre installed in the E4982A Press Help hard key on the front panel to open Quick Start helps in understanding the E4982A oper...

Страница 15: ...the firmware of the E4982A It provides information relevant to the task that needs to be accomplished and reduces the time to search relevant information required to complete a task Service Guide The...

Страница 16: ...Chapter 1 Installation This chapter provides information about how to set up the Keysight E4982A Chapter 2 Troubleshooting This chapter describes the troubleshooting during start up and the procedure...

Страница 17: ...Install the Rack mount Kit Option 1CM 25 How to Install the Rack mount and Handle Kit Option 1CP 25 Connecting Test Head 27 Connecting the DUT when using a special test fixture 27 When using the test...

Страница 18: ...16 Network Analyzer Notes on executing the factory recovery function 49 Procedure to execute the factory recovery 49...

Страница 19: ...l Requirements 20 Installing Front Handles Rack Mounting Flanges 23 Connecting Mouse and Keyboard 32 Power Supply 33 Blown Fuses 34 Starting the E4982A 35 Initial Registration of E4982A 38 Calibration...

Страница 20: ...r has been damaged or the shock absorbing material has traces where extreme force has been applied 2 A packaged item supplied with the meter has mechanical damage or defects 3 A packaged item supplied...

Страница 21: ...Installation 1 LCR Meter 19 inspection by the transport company save the packing box shock absorbing material and packaged items as you received them...

Страница 22: ...the E4982A Online Help When the environmental temperature around the meter is kept within the temperature range of the operating environment specification See Section Operating Environments on page 2...

Страница 23: ...afe work station to protect the electronic components from the damage by the electrostatic discharge ESD as shown in Figure 2 Requirements Back 180 mm Sides 60mm both right and left Figure 1 Ventilati...

Страница 24: ...ply Source on page 36 the power supply is disconnected by removing the power cable s connector plug from either the AC outlet or the E4982A unit When installing the E4982A ensure that there is suffici...

Страница 25: ...part of a measurement system Option 1CM without the handles Option 1CP with the handles Table 1 Keysight E4982A handles rack mounting options Option Name Keysight Part Number 1CN Handle Kit 5063 9229...

Страница 26: ...these steps Step 1 Remove the adhesive backed trim strip 1 from each side of the outer frame of the E4982A front panel Step 2 Use the screws provided screws to mount the front handles 2 on each side o...

Страница 27: ...ll the Rack mount and Handle Kit Option 1CP The rack mount and handle kit includes both the rack mounting flanges locking side plates and front handles While referring to Figure 3 install the rack mou...

Страница 28: ...26 LCR Meter 1 Installation Step 3 Remove the four bottom feet of the E4982A lift the bar marked TAB on the inner side of the foot and slide the foot toward the bar Step 4 Mount the E4982A on the rack...

Страница 29: ...dapter Step 1 As shown in Figure 4 1 attach the test head to the fixture stand with two screws At this point do not tighten the screws completely there should be some play Step 2 As shown in Figure 4...

Страница 30: ...of the connectors using the provided wrench for 3 5 mm SMA connector Figure 5 NOTE Be sure to use the provided wrench for 3 5 mm SMA connector when tightening the connector nut of the 3 5 mm connecto...

Страница 31: ...head to the device using the four screw holes provided in the test head as appropriate Connect the suitable cable connectors test fixture etc for connection of the DUT to the 3 5 mm terminal of the t...

Страница 32: ...Figure 6 2 Step 3 Connect the three N type connectors RF OUT PORT 1 PORT 2 at the end of the cable to the respective test head interfaces RF OUT PORT 1 PORT 2 ont he front panel of the E4982A Figure...

Страница 33: ...Installation 1 LCR Meter 31 Figure 7 Attaching test head to a handle etc...

Страница 34: ...oard The E4982A allows you to connect Mouse and or keyboard through USB USB mouse and keyboard can be connected with the USB ports on the front or rear panels Initial registration of the E4982A requir...

Страница 35: ...from the power outlet Step 1 Confirm that the power cable is not damaged Step 2 Use the supplied cable to connect between the power cable receptacle Figure 8 on page 36 on the rear panel of the E4982A...

Страница 36: ...be subject to failure and must be repaired For any assistance contact Keysight Technologies Customer contact center listed at the end of this guide The product uses the following fuse types UL CSA Typ...

Страница 37: ...once and it changes to green color This operation turns ON the power and the E4982A starts the self test Step 3 Confirm that the self test indicates normal operation Normal operation is confirmed by t...

Страница 38: ...never turn it If you directly interrupt the power supply to the power cable receptacle when the power supply is on or turn off the Line Switch the shutdown process will not work This could damage the...

Страница 39: ...y be sure to follow the guidelines in Ensuring Adequate Free Space around Meter for Immediate Disconnection of Power Cable in Case of Emergency on page 22 When turning the power OFF under normal circu...

Страница 40: ...ou cannot use the front panel keys during the initial registration of the E4982A therefore connect the mouse and the keyboard before turning on the power NOTE If you perform the following procedure in...

Страница 41: ...key on the front panel during boot up Step 2 The screen as shown in the Figure 9 appears Select Windows XP Professional and press Enter Figure 9 System start up screen 1 3 NOTE After several seconds...

Страница 42: ...40 LCR Meter 1 Installation Step 3 The screen as shown in the Figure 10 appears Press Enter Figure 10 System start up screen 2 3...

Страница 43: ...Installation 1 LCR Meter 41 Step 4 The windows start up screen as shown in Figure 11 appears Figure 11 System start up screen 3 3...

Страница 44: ...p 5 In the License agreement dialog box select the I accept this agreement box and click the Next button Figure 12 shows the license agreement dialog box in Windows XP Pro for Embedded Systems Figure...

Страница 45: ...CR Meter 43 Step 6 In the next dialog box set the date and time for your Windows Then click the Next button Figure 13 Step 7 After a while the E4982A restarts automatically Figure 13 Date and Time Set...

Страница 46: ...Menu Step 4 Press Adjust Touch Screen The touch screen calibration screen Figure 14 appears Step 5 Touch the symbol on the upper left of the screen with your finger The symbols also appears on the upp...

Страница 47: ...Installation 1 LCR Meter 45 NOTE If you do not start to perform the touch screen calibration within several seconds the previous measurement screen re appears automatically...

Страница 48: ...46 LCR Meter 1 Installation...

Страница 49: ...de 2 E4982A Troubleshooting Troubleshooting during Startup 48 System Recovery 49 This chapter describes the troubleshooting process during start up and the procedure of the operating system OS recover...

Страница 50: ...mptom Solution Turning on the standby switch does not start up the system Confirm that the power cable is properly plugged in Confirm that the line switch at the rear panel is turned on The system sta...

Страница 51: ...s in the D drive are not affected However Keysight recommends backing them up before executing system recovery for precautionary purposes For more information on backup refer to Backing Up the Data as...

Страница 52: ...E4982A Step 4 Press the standby switch of the E4982A to turn it on Step 5 When the screen as shown in the figure below appears select Keysight Recovery System and press Enter Figure 15 Keysight Recove...

Страница 53: ...ep 6 Type 2 to select Recover Factory Backup Image option and press Enter Step 7 A confirmation message appears Click OK to continue the process Figure 16 System recovery selection screen Figure 17 Sy...

Страница 54: ...ew minutes depending on the amount of data Step 9 Once the recovery process is completed completion message prompts Click OK The E4982A restarts automatically Step 10 Type 5 to select Exit and Restart...

Страница 55: ...ocedure refer to Initial Registration of E4982A on page 38 Step 12 Execute the calibration of the touch screen For information on the execution procedure refer to Calibration of the Touch Screen on pa...

Страница 56: ...54 LCR Meter 2 Troubleshooting...

Страница 57: ...2 38 inspection checking the shipment 18 K Keysight Technologies sales and service office regional sales and support offices 57 shipping consideration due to breakdown etc 9 M manual contents 14 O opt...

Страница 58: ...56 LCR Meter Index...

Страница 59: ...57 1 As of 21 01 04...

Страница 60: ...58 LCR Meter...

Страница 61: ......

Страница 62: ...This information is subject to change without notice Keysight Technologies 2012 2015 Edition 2 February 2015 E4982 90000...

Отзывы: