![Keysight Technologies E4982A Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/keysight-technologies/e4982a/e4982a_installation-manual_1962321024.webp)
22
LCR Meter
1
Installation
Ensuring Adequate Free Space around Meter for Immediate
Disconnection of Power Cable in Case of Emergency
“Disconnection from Supply Source" on
, the power supply is disconnected by removing the
power cable’s connector plug from either the AC outlet or
the E4982A unit. When installing the E4982A, ensure that
there is sufficient free space around the unit to permit quick
disconnection of the plug (from AC outlet or E4982A unit) in
case of emergency.
Figure 2
Example of the static-safe work station
Содержание E4982A
Страница 2: ......
Страница 3: ......
Страница 33: ...Installation 1 LCR Meter 31 Figure 7 Attaching test head to a handle etc...
Страница 48: ...46 LCR Meter 1 Installation...
Страница 56: ...54 LCR Meter 2 Troubleshooting...
Страница 58: ...56 LCR Meter Index...
Страница 59: ...57 1 As of 21 01 04...
Страница 60: ...58 LCR Meter...
Страница 61: ......