![Keysight Technologies E4982A Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/keysight-technologies/e4982a/e4982a_installation-manual_1962321039.webp)
Installation
1
LCR Meter
37
N O T E
To allow this operation to be performed smoothly, be sure to follow the
guidelines in
“Ensuring Adequate Free Space around Meter for Immediate
Disconnection of Power Cable in Case of Emergency" on page 22
.
When turning the power OFF under normal circumstances, always follow
the methods described in
“Turning the Power OFF" on page 35
.
Содержание E4982A
Страница 2: ......
Страница 3: ......
Страница 33: ...Installation 1 LCR Meter 31 Figure 7 Attaching test head to a handle etc...
Страница 48: ...46 LCR Meter 1 Installation...
Страница 56: ...54 LCR Meter 2 Troubleshooting...
Страница 58: ...56 LCR Meter Index...
Страница 59: ...57 1 As of 21 01 04...
Страница 60: ...58 LCR Meter...
Страница 61: ......