(1) Measurement Preparations
1
Preparing the power source
The LE-200C • LH-200C • LZ-200C have been designed for
use with either 100V/220V AC 50/60Hz or dry cell batteries
as the power supply.
(a) Running the LE-200C • LH-200C • LZ-200C on a 100V/
220V AC power supply
Turn the main unit's power switch off and insert the plug of
the supplied AC adapter into the AC adapter Socket on the
right side of the main unit. Next connect the AC adapter to
a 100V/220V power supply socket.
(b) Running the LE-200C • LH-200C • LZ-200C • on dry cell
batteries
Turn the main unit's power switch off and then insert batteries
into the rear battery compartments.
Main Unit section : 1.5V (size AA alkaline batteries) x 6
Printer section
: 1.5V (size AA alkaline batteries) x 4
* Only use alkaline batteries.
(c) Running the LE-200C • LH-200C • LZ-200C on both an
AC power supply and dry cell batteries
When the AC adapter plug is connected to the unit's AC
Adapter Socket with dry cell batteries loaded into the com
partment the unit will automatically switch over to the
AC power supply.
6.Operating the Coating Thickness Tester
10
Diagram 2
Diagram 1
Содержание LE-200C
Страница 1: ...Operation Manual Model LE 200C LH 200C LZ 200C Coating Thickness Testers ...
Страница 2: ......
Страница 39: ......
Страница 40: ...0510 MA 0301 100 ...