2”
(5 cm)
This side up
2”
(5 cm)
silicon
Downward slope
2nd
post
GROUND
2”-6” (5cm-15cm)
?
option 2
2nd
post
GROUND
2”-6” (5cm-15cm)
1st
post
1st
post
option 1
?
GROUND
2nd
post
2”-6” (5cm-15cm)
Level
GROUND
2nd
post
2”-6” (5cm-15cm)
3
4
1
2
(X2)
7
5
1st
post
1st
post
String/fence line to show
horizontal accuracy.
12
ATTACH POST CAPS
1.
Press caps down on post top.
2. You can secure the caps with silicone.
7
6
FIXING THE FIRST RAIL
Place the first post in the hole, checking that it satisfies ALL the following conditions:
1
2
3
Make sure the rail is horizontally level, at a 90° angle to the second post.
1. Place the lower rail in position.
2. Fix the rail to the post with 2 screws (
s35)
, through the bracket
holes.
3. Level the rail horizontally. Use timber to help you.
INSTALLING A FENCE SECTION
LEVEL, DOWNWARD SLOPE & UPWARD SLOPE
If the distance is 2”-6” (5-15cm),
place the positioning guide 4” (10cm) from the ground and fix
the brackets with 3 (s18b) screws each.
8
FIXING THE SECOND POST
(Take into account the level – downward or upward slope)
1
2
3
90
o
90
o
up
12”-20“ (
30-50cm)
GROUND
EXTENDING THE POST
For fence sections that are less than the standard
6‘ (182 cm) center-to-center, simply cut the rails
and the fence panels to size, using a power saw.
1. Attach three brackets to the post using the positioning guide.
2. Place the post in the hole.
3. Fix the post to the rail with 2 screws (
s35)
through the bracket holes.
4. Add dry or ready mix concrete. Allow concrete to set for 10-15 minutes.
Check that the rail is level and that the post is vertical from both sides.
11
INSTALLING A FENCE SECTION
10
Position the brackets on the empty side of the post, considering the 3 following options:
If the distance is more than 6" (15cm),
place the lower bracket 2" (5cm) from the ground
using 3 (s18b) screws. Fix the second bracket with 3 (s18b) screws using the positioning guide.
?
GROUND
GROUND
Upward slope
2nd
post
3th
post
GROUND
3th
post
2nd
post
option 3
In the case of an upward slope, connect the brackets 2" (5cm) up, and/or position the
new post lower while digging a trench for the rail.
Use the positioning guide to make sure that the upper bracket on the left side is
not over the top of the post.
9
Slot the first panel
into the bottom rail.
Make sure the panel goes
into the brackets.
Assemble the second rail
on top of the panel.
Make sure the rail goes
into the brackets.
SCREW FROM
BOTH SIDES
Using screws (s35), fix the
upper and middle rails to the brackets.
4
Slot the the second
panel into the middle rail.
6
Assemble the upper rail on
top of the second panel.
The post must be cast at least 12“ (30 cm) in the ground. If you have a slope that is
over 12“ (30 cm), you
must extend
the post with timber as shown.
Use 4”/4”/24” (11/11/60 cm timber).
Fix with 8 screws.
BOT
TOM