background image

2”

(5 cm)

This side up

2”

(5 cm)

silicon

      

Downward slope

2nd 

post

GROUND 

2”-6” (5cm-15cm)

?

option 2

2nd 

post

GROUND 

2”-6” (5cm-15cm)

1st 

post

1st 

post

option 1

?

GROUND 

2nd 

post

2”-6” (5cm-15cm)

Level

GROUND 

2nd 

post

2”-6” (5cm-15cm)

3

4

1

2

(X2)

7

5

1st 

post

1st 

post

String/fence line to show 

horizontal accuracy.

12

ATTACH POST CAPS

1.

 Press caps down on post top.

2. You can secure the caps with silicone.

7

6

FIXING THE  FIRST RAIL

Place the first post in the hole, checking that it satisfies ALL the following conditions:

1

2

3

Make sure the rail is horizontally level, at a 90° angle to the second post.

1. Place the lower rail in position.

2. Fix the rail to the post with 2 screws (

s35)

, through the bracket 

holes.

3. Level the rail horizontally. Use timber to help you.

       

INSTALLING A FENCE SECTION

LEVEL, DOWNWARD SLOPE & UPWARD SLOPE 

If the distance is 2”-6” (5-15cm), 

place the positioning guide 4” (10cm) from the ground and fix 

the brackets with 3 (s18b) screws each.

8

FIXING THE SECOND POST 

(Take into account the level – downward or upward slope)

1

2

3

90

o

90

o

up

12”-20“ (

30-50cm)

GROUND 

EXTENDING THE POST

For fence sections that are less than the standard

6‘ (182 cm) center-to-center, simply cut the rails 

and the fence panels to size, using a power saw.

1. Attach three brackets to the post using the positioning guide.

2. Place the post in the hole.

3. Fix the post to the rail with 2 screws (

s35) 

through the bracket holes.

4. Add dry or ready mix concrete. Allow concrete to set for 10-15 minutes.

                   Check that the rail is level and that the post is vertical from both sides.

       

11  

INSTALLING A FENCE SECTION

10

Position the brackets on the empty side of the post, considering the 3 following options: 

If the distance is more than 6" (15cm), 

place the lower bracket 2" (5cm) from the ground 

using 3 (s18b) screws. Fix the second bracket with 3 (s18b) screws using the positioning guide.

 

                  

?

GROUND 

GROUND 

Upward slope

2nd 

post

3th 

post

GROUND

 

3th 

post

2nd 

post

option 3

In the case of an upward slope, connect the brackets 2" (5cm) up, and/or position the 

new post lower while digging a trench for the rail.

Use the positioning guide to make sure that the upper bracket on the left side is 

not over the top of the post.

  

9  

Slot the first panel

into the bottom rail. 

Make sure the panel goes

into the brackets. 

 

Assemble the second rail

on top of the panel.

Make sure the rail goes

into the brackets. 

   

SCREW FROM 

 BOTH SIDES

Using screws (s35), fix the 

upper and middle rails to the brackets. 

4

Slot the the second

panel into the middle rail. 

6

Assemble the upper rail on 

top of the second panel.

The post must be cast at least 12“ (30 cm) in the ground. If you have a slope that is

 over 12“ (30 cm), you 

must extend 

the post with timber as shown.

                                                                        Use 4”/4”/24” (11/11/60 cm timber).

                                                                        Fix with 8 screws.

BOT

TOM

Содержание 555519

Страница 1: ...laced 68 172 cm from the top of the post C Attach the positioning guide to the post as shown D Place the bracket within the positioning guide hole 1 Attach three rail brackets fcb to one side of the post 2 Do not assemble brackets on both sides of the post 3 Place the positioning guide 68 172 cm from the top of the post then place the bracket 4 Locate all bracket screws s18b in the center of the e...

Страница 2: ...to the rail with 2 screws s35 through the bracket holes 4 Add dry or ready mix concrete Allow concrete to set for 10 15 minutes Check that the rail is level and that the post is vertical from both sides 11 INSTALLING A FENCE SECTION 10 Position the brackets on the empty side of the post considering the 3 following options If the distance is more than 6 15cm place the lower bracket 2 5cm from the g...

Страница 3: ...ozo con cemento de acuerdo con las instrucciones de fábrica A Doble las aletas de la guía de posicionamiento B La guía de posicionamiento debe colocarse a 68 172 cm de la parte superior del poste C Coloque la guía de posicionamiento en el poste tal como se muestra D Coloque la ménsula dentro del agujero de la guía de posicionamiento 1 Coloque las tres ménsulas de las barandas fcb en un lado de los...

Страница 4: ...centro a centro simple mente corte las barandas al tamaño y los paneles de la cerca con una sierra eléctrica 1 Coloque las tres ménsulas en el poste usando la guía de posicionamiento 2 Ubique el poste en el pozo 3 Fíjelo a la baranda con 2 tornillos s35 a través de los agujeros de la ménsula 4 Agregue cemento o mezcla seca Espere unos 10 15 minutos hasta que el cemento se endurezca Verifique que l...

Страница 5: ...ositionnement à 172 cm 68 en partant du haut du poteau C Fixez le guide de positionnement au poteau comme indiqué sur l image D Placez le crochet dans le trou du guide de positionnement 1 Fixez 3 crochets de traverse fcb à l un des côtés du poteau 2 Ne pas fixer les crochets sur les deux côtés du poteau 3 Placez le guide de positionnement à 172 cm 68 en partant du haut du poteau puis placez le cro...

Страница 6: ...e trou 3 Fixez le poteau à la traverse à l aide de deux vis s35 à travers les trous des crochets 4 Ajoutez du béton sec ou mélangé et laissez sécher pendant 10 à 15 minutes Vérifiez que la traverse est à niveau et que le poteau est vertical dans les deux directions 11 INSTALLATION DES SECTIONS DE CLÔTURE 10 Placez les crochets du côté vide dans le prolongement du poteau en considérant les 3 option...

Страница 7: ...sich um einen Zaun zur Grundstücksabgrenzung handelt sollten Sie die Grundstücksgrenzen überprüfen bevor Sie den Zaun bestellen Die Bauteile sollten überprüft und systematisch und griffbereit ausgelegt werden Geben Sie alle Kleinteile z B Schrauben etc in eine Schüssel so dass nichts verloren geht Bitte bewahren Sie die Frachtnummer die auf dem Karton angegeben ist auf um diese Nummer angeben zu k...

Страница 8: ...ern am Pfosten an indem Sie das Führungsteil benutzen 2 Stellen Sie den Pfosten in das Loch 3 Befestigen Sie den Pfosten an der Leiste mit 2 Schrauben s35 durch die Halteklammerlöcher 4 Fügen Sie nun Beton Trocken oder Mischbeton in den verbleibenden Zwischenraum hinzu Lassen Sie den Beton 10 15 Minuten trocknen 11 MONTIEREN DES ZAUNTEILS 10 Positionieren Sie die Halteklammern an der leeren Seite ...

Страница 9: ...metodi e le procedure da noi adottate sono utilizzate da installatori professionisti per guidarvi attraverso la giusta installazione della vostra recinzione SUGGERIMENTI GENERALI Questo lavoro di assemblaggio va effettuato da 2 persone Nel caso si tratti di una recinzione di delimitazione della proprietà bisognerà confermare i confini della proprietà prima di ordinare la recinzione Controllare le ...

Страница 10: ...o basta semplicemente adattarli tagliando le traverse e i pannelli della recinzione con l ausilio di una sega elettrica 1 Fissare al palo tre staffe con l ausilio della guida di posizionamento 2 Posizionare il palo all interno della buca 3 Fissare il palo alla traversa con 2 viti s35 attraverso i fori della staffa 4 Aggiungere della malta o del calcestruzzo preconfezionato Lasciare il calcestruzzo...

Отзывы: