![Kessler Engineering TL-922 Revival (tm) Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/kessler-engineering/tl-922-revival-tm/tl-922-revival-tm_installation-manual_1958034041.webp)
34
4. Confirm both meters are illuminated.
5. Confirm operation of the Step-Start Relay (Within 1-2 seconds after switching the
amplifier
ON
, the Step-Start Relay should produce a soft “Click” and the meter illu-
mination should noticeably brighten).
6. After approximately 20 Seconds, switch the amplifier “POWER” switch
OFF
.
If the amplifier Step-Start Relay energized properly and the meters illuminated, then bright-
ened after the Step-Start interval, proceed with the following test. Otherwise, unplug the
amplifier from the AC mains and begin troubleshooting.
1. Insert the amplifier keying line into the “RL CONT” jack.
2. Ensure the free-end of the keying line is electrically “Open”.
3. Switch the amplifier
ON
and reconfirm proper Step-Start operation.
4. Confirm that neither
ON AIR
nor
STBY
lights is illuminated.
5. Change the amplifier “LINEAR” switch from
STBY
to
OPERATE
.
Confirm the
STBY
light is now illuminated.
6. Electrically short the “Open” end of the keying line.
Confirm the
STBY
light is extinguished and
ON AIR
light is illuminated.
7. Set the “LINEAR” switch to
STBY
.
Confirm
STBY
and
ON AIR
lights are extinguished.
8. Set the “LINEAR” switch to
OPERATE
, and short the keying line.
Confirm the
STBY
light is extinguished and
ON AIR
light is illuminated.
9. Open the keying line.
Confirm
ON AIR
light extinguished and
STBY
light illuminated.
10. Electrically short the “Open” end of the keying line (again).
Reconfirm the
STBY
light is extinguished and
ON AIR
light is illuminated.
11. With the keying line still shorted, set the “LINEAR” switch to
STBY
.
Confirm
STBY
and
ON AIR
lights are extinguished.
12. Leave the “LINEAR” switch set to
STBY
.
13. Switch the amplifier
OFF
.
www.KesslerEngineeringLLC.com
Содержание TL-922 Revival (tm)
Страница 7: ...vii List of Tables 3 1 TL 922 Revival tm Modification Kit Contents 5 www KesslerEngineeringLLC com...
Страница 13: ...6 Figure 3 1 TL 922 Revival tm Upgrade Kit Contents www KesslerEngineeringLLC com...
Страница 18: ...11 Figure 3 4 LED Circuit Board Correctly Installed www KesslerEngineeringLLC com...
Страница 30: ...23 Figure 3 19 QSK PCB to QRO Output Connections www KesslerEngineeringLLC com...
Страница 34: ...27 Figure 3 23 Electronic Bias PCB Installed www KesslerEngineeringLLC com...
Страница 46: ...39 3 8 7 Electrical Schematics Figure 3 29 Step Start Schematic Diagram www KesslerEngineeringLLC com...
Страница 47: ...40 Figure 3 30 Step Start PCB www KesslerEngineeringLLC com...
Страница 48: ...41 Figure 3 31 QSK T R Relay Schematic Diagram Figure 3 32 QSK T R Relay PCB www KesslerEngineeringLLC com...
Страница 49: ...42 Figure 3 33 LED Schematic Diagram Figure 3 34 LED PCB www KesslerEngineeringLLC com...
Страница 50: ...43 Figure 3 35 Electronic Bias Schematic Diagram www KesslerEngineeringLLC com...
Страница 51: ...44 Figure 3 36 Electronic Bias PCB www KesslerEngineeringLLC com...
Страница 54: ...47 User Notes www KesslerEngineeringLLC com...
Страница 55: ...48 5 1 User Notes Continued www KesslerEngineeringLLC com...
Страница 56: ...49 5 2 User Notes Continued www KesslerEngineeringLLC com...
Страница 57: ...50 5 3 User Notes Continued www KesslerEngineeringLLC com...