89
Table of contents
1. Safety instructions
.......... .............................................................................................. Page 88
2. General
2.1 Area of application ................................................................. Page 91
2.2 Description of system............................................................... Page 91
2.3 Plant configuration .................................................................. Page 92
2.4 Dimensions and useful volume .............................................. Page 97
2.5 Functional description ............................................................ Page 98
3. Packaging, transport and storage
3.1 Packaging................................................................................ Page 100
3.2 Transport................................................................................. Page 100
3.3 Storage.................................................................................... Page 100
4. Installation and assembly
4.1 Place of installation ................................................................. Page 101
4.2 Excavation pit.......................................................................... Page 101
4.3 Blinding layer ......................................................................... Page 101
4.4 Placing.................................................................................... Page 102
4.5 Filling the tank ........................................................................ Page 102
4.6 Backfilling the excavation pit ................................................... Page 102
4.7 Pipework................................................................................. Page 102
4.8 Laying the connecting lines .................................................... Page 103
4.9 Assembly of the attachment pieces ....................................... Page 103
4.10 Filling ...................................................................................... Page 104
4.11 Installation control unit and compressor ................................ Page 105
5. Commissioning
5.1 Making the plant ready for operation ...................................... Page 108
5.2 Operator's duties..................................................................... Page 109
5.3 Instruction of the Customer .................................................... Page 109
6. Operation and disposal
6.1 Operation ................................................................................ Page 110
6.2 Self-inspection by the operator ............................................... Page 110
6.3 Things that do not belong into a septic system ....................... Page 111
6.4 Disposal................................................................................... Page 112
7. Maintenance
7.1 Preliminary sedimentation and aeration ................................. Page 113
7.2 Compressor............................................................................. Page 114
8. Control of the septic system
8.0 ............................................................................................... Page 115
8.1 System menu ......................................................................... Page 117
8.2 Information menu .................................................................. Page 117
8.3 Maintenance menu ................................................................. Page 117
9. Malfunctions and remedial measures
............................................. ................................................... Page 119
10. Warranty
..... .
................................................................................................ Page 122
11. Plant passport and factory approval
.......
................................................................................................ Page 123
12. Declaration of conformity
.......
................................................................................................ Page 124
13. Operations diary
.......
................................................................................................ Page 125
14. Maintenance checklist
.......
................................................................................................ Page 126
15. Technical specifications
.......
................................................................................................ Page 127
16. Important contacts/info
.......
................................................................................................ Page 129
Inno-Clean_2. Generation_3-sprachig_132Seiten:010-341 Stand 05/07 26.11.2009 12:43 Uhr Seite 89
Содержание INNO-CLEAN
Страница 128: ...Spare Parts Inno Clean_2 Generation_3 sprachig_132Seiten 010 341 Stand 05 07 26 11 2009 12 44 Uhr Seite 128 ...
Страница 130: ... Notice 130 Inno Clean_2 Generation_3 sprachig_132Seiten 010 341 Stand 05 07 26 11 2009 12 44 Uhr Seite 130 ...
Страница 131: ... Notice 131 Inno Clean_2 Generation_3 sprachig_132Seiten 010 341 Stand 05 07 26 11 2009 12 44 Uhr Seite 131 ...