46 / 156
Installation
12/2019
3.14
Installing the upper section
Depending on installation depth, the upper section (insertion depth of the
upper section <3>) must be cut to length or given recesses
<67> for the pipe connections which are routed into the drain body
<1> at the side.
The upper section <3> may only be extended using a maximum of
2 extension sections, so that technicians can still reach down to the
drain body for maintenance purposes.
- Insert the sealing gasket <37> grease-free into the groove on the drain
body <1>.
- Grease the sealing lips of the sealing gasket <37>.
- Push the upper section <3> into the drain body and align it.
3.15
Installing the inflow cover
This is fitted to protect the drain from soiling
through e.g. construction material.
For this:
- Keep the sealing area clean
- Grease the outside of the sealing gasket
• Insert the inflow cover <51> into the upper section <3>.
• Close both cover closures <78>.
3
67
37
1
Fett
Fig. [21]
3
51
78
Fig. [22]
Содержание Ecolift SPZ 1000
Страница 25: ...DOP Leistungserklärung 25 156 12 2019 7 DOP Leistungserklärung ...
Страница 26: ...26 156 DOP Leistungserklärung 12 2019 ...
Страница 51: ...DoP Declaration of Performance 51 156 12 2019 7 DoP Declaration of Performance ...
Страница 52: ...52 156 DoP Declaration of Performance 12 2019 ...
Страница 77: ...DoP Déclaration de performance 77 156 12 2019 7 DoP Déclaration de performance ...
Страница 78: ...78 156 DoP Déclaration de performance 12 2019 ...
Страница 103: ...DoP Dichiarazione di prestazione 103 156 12 2019 7 DoP Dichiarazione di prestazione ...
Страница 104: ...104 156 DoP Dichiarazione di prestazione 12 2019 ...
Страница 129: ...DOP vermogensverklaring 129 156 12 2019 7 DOP vermogensverklaring ...
Страница 130: ...130 156 DOP vermogensverklaring 12 2019 ...
Страница 155: ...DOP Deklaracjawłaściwościużytkowych 155 156 02 2019 7 DOP Deklaracja właściwości użytkowych ...
Страница 156: ...156 156 DOP Deklaracjawłaściwościużytkowych 02 2019 ...