44 / 156
Installation
12/2019
3.11
Preparing the connection of the pressure pipe
- Remove the sealing plug <21> on the drain body <1>.
- Insert sealing gasket <24>.
- Fit the connecting piece <22> from the inside of the drain body on
the extension section <1> and tighten the nut <23>
from the outside using approx. 10 Nm.
- Connect the on-site pressure pipe to the connecting piece.
3.12
Only for installation in an exposed drainage pipe
- Fit a connection piece <80> between the pump connection
muff <18> and connection piece <22>,
and lock both the quick-release closures <25>.
1
22
23
21
24
Fig. [18]
18
80
22
25
Fig. [19]
Содержание Ecolift SPZ 1000
Страница 25: ...DOP Leistungserklärung 25 156 12 2019 7 DOP Leistungserklärung ...
Страница 26: ...26 156 DOP Leistungserklärung 12 2019 ...
Страница 51: ...DoP Declaration of Performance 51 156 12 2019 7 DoP Declaration of Performance ...
Страница 52: ...52 156 DoP Declaration of Performance 12 2019 ...
Страница 77: ...DoP Déclaration de performance 77 156 12 2019 7 DoP Déclaration de performance ...
Страница 78: ...78 156 DoP Déclaration de performance 12 2019 ...
Страница 103: ...DoP Dichiarazione di prestazione 103 156 12 2019 7 DoP Dichiarazione di prestazione ...
Страница 104: ...104 156 DoP Dichiarazione di prestazione 12 2019 ...
Страница 129: ...DOP vermogensverklaring 129 156 12 2019 7 DOP vermogensverklaring ...
Страница 130: ...130 156 DOP vermogensverklaring 12 2019 ...
Страница 155: ...DOP Deklaracjawłaściwościużytkowych 155 156 02 2019 7 DOP Deklaracja właściwości użytkowych ...
Страница 156: ...156 156 DOP Deklaracjawłaściwościużytkowych 02 2019 ...