Handover protocol
59 / 60
V 1.0
Handover protocol for the installing company
The plant operator, and authorised acceptance officers, were present during the start-up and induction of this
system.
The plant operator/authorised acceptance officer was notified of the obligation for maintenance of the product in
accordance with the attached
user's manual.
The start-up and induction have not
been carried out
The following components and/or product components were handed over to the customer:
The start-up and induction will be carried out by (company, address, contact, tel.):
The precise coordination of dates for the start-up/induction will be carried out by the plant operator and the company
performing the start-up.
Location, Date
Signature
Authorised acceptance officer
Signature
Plant operator
Signature
Installing company
Содержание Aqualift F XL 200
Страница 2: ...Inhalt V 1 0 2 60 1 Inhalt...
Страница 27: ......
Страница 34: ...ContendTable of contents V 1 0 34 60...
Страница 57: ......