Table of Contents
15
Contents
1. Area of use
17
2. Technical data
18
2.1 Dimensioned drawing
18
3. Packaging, transport and storage
18
3.1 Transport
18
3.2 Storage
18
4. Installation and assembly
19
4.1 Installation requirements
19
4.2 Fill material
19
4.3 Excavation pit
19
4.4 Tests before installation
19
4.5 Installation
20
4.6 Installation levels for probes
20
5. Commissioning
21
5.1 Getting the system ready for operation
21
5.2 Briefing / handover
21
6. Disposal
21
7. Maintenance
22
8. System passport / Factory approval
23