background image

TBC  OPR 071019

2-1

SECTION 2 - INSTALLATION

2.1

UNPACKING AND INSPECTION

This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After unpacking, inspect for shipping damage before attempting to operate. Perform
the preliminary inspection as outlined in the following paragraph. If any indication of damage is
found, file an immediate claim with the responsible transport service. 

2.2

TERMINATIONS, CONTROLS AND INDICATORS

a.

Front Panel: 

See Table 2-1 for a description of front panel controls and indicators.

Refer to Figure 2-1 for all models except TBC 24-120M and TBC 48-60M. Refer to Fig-
ure 2-2 for TBC 24-120M and TBC 48-60M. 

TABLE 2-1.  FRONT PANEL CONTROLS AND INDICATORS

FIG. 2-1 

OR FIG. 2-2

INDEX NO.

NAME

FUNCTION

1

POWER ON/OFF

circuit breaker

Main AC input power circuit breaker.

2

VOLTS,

LCD display (2)

3-1/2 digit LCD meter for reading voltage.

3

AMPS

LCD display

3-1/2 digit LCD meter for reading current.

4

EQUALIZE  TIME

timer

0.1 to 99.9 hour timer that can be set to establish the duration of the Equalize 
cycle. 

5

START

switch

Pressing START button starts the EQUALIZE TIME timer as the Equalize mode 
begins. 

6

RESET

switch

Pressing RESET button resets the EQUALIZE TIME timer as the TBC returns to 
the Float mode. 

7

CHARGING STOPPED

indicator

Red LED to indicate that the TBC has stopped charging.

8

EQUALIZE

adjustment control

Screwdriver adjustment of equalize voltage.

9

EQUALIZE

indicator

Amber LED that flashes when the TBC is in the Equalize mode (high rate of 
charging).

10

VOLTAGE ADJUST

lock

A sliding plate behind the panel allows access to the Float and Equalize voltage 
controls. For precise settings of these controls refer to the battery's manufacturer.

11

FLOAT

adjustment control

Screwdriver adjustment of float voltage.

12

FLOAT

indicator

Green LED to indicate when the TBC is in the Float mode (slow rate of charging). 

13

POWER ON

indicator

Green LED power on indicator. 

14

POWER ON/OFF

Locking Plate

Prevents accidental shutoff of TBC. See PAR. ?? for details.

Содержание TBC 12-50M

Страница 1: ...fice in New York 718 461 7000 requesting the correct revision for your par ticular model and serial number 3 The contents of this manual are protected by copyright Reproduction of any part can be made...

Страница 2: ......

Страница 3: ...eration 3 3 1 1 TBC Series Rack Mount Battery Charger Power Supply ii 1 2 TBC Mechanical Outline Drawing 1 5 2 1 TBC Series Except TBC 24 120M and TBC 48 60M Front Panel Controls and Indicators 2 2 2...

Страница 4: ...ii TBC OPR 071019 FIGURE 1 1 TBC SERIES RACK MOUNT BATTERY CHARGER POWER SUPPLY...

Страница 5: ...senses that the battery is not absorbing current from the Charger but rather is supplying current back to the TBC This sensor is very sensitive It can respond to a reverse current of less than 50 mil...

Страница 6: ...00 240V a c 12 VOLT MODELS TBC 12 20M 12 11 15 22 9 3 7 90 A 1 21 9 5 TBC 12 50M 12 11 15 53 9 3 7 90 A 1 25 11 4 TBC 12 100M 12 11 15 100 18 9 90 A 1 TBC 12 120M 3 12 11 5 15 120 22 11 81 A 1 33 15 2...

Страница 7: ...c max Startup Time 900mS max Holdup Time 30mS max EMI FCC Class A Power Factor 0 99 typ 100V a c input rated output Output Characteristics Source Effect typical 0 8 115 15V a c 230 30 V a c Minimum M...

Страница 8: ...sensing and logic outputs for status mon itoring The DC output has factory preset voltage and current limit adjustments The TBC has an overvoltage protection circuit that senses the output at the Mon...

Страница 9: ...071019 5 FIGURE 1 2 TBC MECHANICAL OUTLINE DRAWING 1 5 1 6 Blank 4 5...

Страница 10: ......

Страница 11: ...y 3 1 2 digit LCD meter for reading current 4 EQUALIZE TIME timer 0 1 to 99 9 hour timer that can be set to establish the duration of the Equalize cycle 5 START switch Pressing START button starts the...

Страница 12: ...BC 24 120M AND TBC 48 60M FRONT PANEL CONTROLS AND INDICATORS b Rear Panel The TBC has two output power terminals for connecting to the battery and or load It also has two terminal blocks TB1 and TB2...

Страница 13: ...the TBC A short circuit or logic low between these two terminals will return the TBC to operation Logic high is between 2 4V and 24V d c logic low is between 0V and 0 4V d c When high this terminal ca...

Страница 14: ...ay be hazardous Refer to Table 1 2 for input current specifi cations and ensure source power is off and TBC Power ON OFF is set to OFF before proceeding a Remove the four screws from the small panel l...

Страница 15: ...is imperative that the chassis of the power supply be returned to AC ground with a separate lead A grounding terminal is pro vided on Terminal Block TB3 for this purpose a Terminal Block TB3 on the C...

Страница 16: ...ed with the TBC Four screws flat head 10 32 x 1 2 100 degrees coun tersink six screws truss head phillips 10 32 x 3 8 black and six Internal lockwashers no 10 are also included The mounting flanges ea...

Страница 17: ...TBC OPR 071019 2 7 2 8 Blank FIGURE 2 6 RACK MOUNTING...

Страница 18: ......

Страница 19: ...nt may be located directly at one of the output terminals of the Power Supply which may be connected to ground If Error Sensing is employed DC ground can be established at the remote load In case of a...

Страница 20: ...oad wire voltage drops Observe polarities The negative Sensing wire must go to the nega tive load wire and the positive Sensing wire goes to the positive load wire The Remote Sensing terminals must be...

Страница 21: ...her terminal 9 on TB1 for all the TBC units in operation see Figure 2 3 NOTE To operate up to three TBC Battery Charger Power Supply units in parallel set the desired output voltages at the load for e...

Страница 22: ...3 4 TBC OPR 071019 FIGURE 3 3 SUGGESTED WIRING FOR UP TO THREE TBC UNITS WITH REMOTE SENSING AND REMOTE CONTROL...

Отзывы: