Section B – Page #12
NOV/2005
STEP ILLUSTRATION
STEP 6
Open the charge valve (21) on
the accumulator about one full
turn.
STEP 7
Open the valve on the nitrogen
tank.
Open the shut-off valve (12)
gradually, allowing nitrogen to
flow into the accumulator until the
charge kit pressure gauge (11)
reads the pressure determined
under Step 5, then close the shut-
off valve.
STEP 8
Close the charge valve (21) on
the accumulator and reinstall the
cap (19) and o-ring (20).
STEP 9
Remove the elbow end (18) of the
charge kit from the charge kit
adapter.
Содержание Nordco KF3BM
Страница 2: ......
Страница 5: ...NOV 2005 Section A Page 1 SECTION A GENERAL INFORMATION...
Страница 10: ...Section A Page 6 NOV 2005 This page intentionally blank...
Страница 11: ...NOV 2005 Section B Page 1 SECTION B MAINTENANCE...
Страница 25: ...NOV 2005 Section C Page 1 SECTION C TROUBLESHOOTING...
Страница 29: ...NOV 2005 Section D Page 1 SECTION D PARTS LIST...
Страница 30: ...Section D Page 2 NOV 2005...
Страница 36: ...Section D Page 8 NOV 2005 THIS PAGE INTENTIONALLY BLANK...