2·2 Inspection end cleaning
ihen the machine is delivered, check for damage or shortages in the nu
mber of attachments. Then wipe off dirt and protective coating.
2-3
Foundation
Before installation, construct a foundation of sufficient thickness (n
ormally 450 mm) and pressure-supporting area (depending on the nature of
the ground at the installation site) according to the floor plan introdu
ced in Fig.S.However, if the installation site has a concrete floor of s
ufficient strength, the construction of a foundation is unnecessary. When
installing, achieve leveling by using anchor bolts and wedges or by using
a precision level in combination with wedges or leveling blocks.
2·4
lnstallatlon
On the bottom of the machine base, dollies are provided at four corners
as shown in( Fig-5) The machine should be balanced on the four points.
2·5 Maintenance and Inspection
(1) Precautions for operation
1) Always supply lubricating oi I to designated oiling points befor
starting. Table 1. for your reference.
2) Confirm that the work and setting jigs do not strike anything
before actuating table feed.
3) The power table longitudinal feed should not exceed the range
limitations of the machine. Always set the automatic reversing
do[ on both sides within the moving range.
( VHS00S, VHS00VS, VHS00EVS)
Foundation:
Fig-5
950
jia5
580
I\
B
�I
• 1 •
0
l{)
C'?
0
0
0
l()
150
1200
....... .L...._._-�-19"'1�
150
175
0
0
0
__ _J
325
1 •
I •
850
325
·1
0
0
C')
- 6 -
S: J/18
'50001'275
Property
of
Kent
Industrial
USA
Do
Not
Reproduce