
SuperSnake GTX
Operating manual - EN
4.
Take the old liner out from the hose, pulling from the subfeeder end.
Install new liner:
1.
Feed the new liner into the hose from the wire feeder end.
2.
Ensure that the wire liner is all the way through and that at least the length of the liner sleeve of wire liner is extrud-
ing from the subfeeder end of the cable.
3.
Insert the cone, sealing ring and liner sleeve on the wire liner at the subfeeder end.
Use wire liner specific accessories delivered with the new wire liner.
The sealing ring must be positioned so that the end with the bigger aperture goes in first. When assembled, the seal-
ing ring must go over the edge of the cone. This is needed to secure the wire liner in place.
© Kemppi
27
1921930 / 2144