2.7 Shielding gas setting
The shielding gas flow rate from the welding gun is set according to the application, weld joint, gas type and gas nozzle
shape and size. The flow rate should be measured at the welding gun nozzle via a rotameter before welding. Normally
the measure is between 10...20 liters per minute for various welding applications.
If you have not welded for a while, flush the system with shielding gas before welding by pressing the Gas test button
on the wire feeder or directly on the subfeeder.
Handle shielding gas bottle with care. Assess the risks associated with handling and using compressed gas. Always
use a cylinder transport carriage and secure the cylinder safely.