1.
Satellite post ID
2.
Info
3.
Charging protocol and available charging power
4.
Battery SoC, charged energy and remaining time
5.
Battery SoC (press battery for more detailed info)
6.
QR code for mobile following
7.
Activity button
8.
Stop
Figure 8. The touch screen has seven main active fields that change during each session.
4.2 Charging of electric vehicle
Prior to start DC charging the user needs to authorize charging session of the selected
Satellite post. Authorization can be based RFID card or tag.
Charging session
1.
Select the correct charging plug that is appropriate to your vehicle.
2.
Attach the plug to the vehicle and ensure that the charging plug is properly inside the
socket.
3.
User indentification (if enabled).
C- AND S-OPERATION MANUAL - EN
14
11/11/2021 1.07
Содержание C Series
Страница 1: ...C Station C Series S Series Charging System OPERATING MANUAL ...
Страница 14: ...3 6 Connector types Figure 6 1 CCS Type 2 2 CHAdeMO 3 Type 2 C AND S OPERATION MANUAL EN 12 11 11 2021 1 07 ...
Страница 23: ...5 2 CPU C501 C801 Figure 14 CPU C501 C801 C AND S OPERATION MANUAL EN 21 11 11 2021 1 07 ...
Страница 24: ...5 3 CPU C502 C802 Figure 15 CPU C502 C802 C AND S OPERATION MANUAL EN 22 11 11 2021 1 07 ...
Страница 25: ...5 4 CPU C503 C803 Figure 16 CPU C503 C803 C AND S OPERATION MANUAL EN 23 11 11 2021 1 07 ...
Страница 26: ...5 5 C Station Figure 17 Dimensions C AND S OPERATION MANUAL EN 24 11 11 2021 1 07 ...