background image

C-Station, C-Series, S-Series

Charging System

OPERATING MANUAL

Содержание C Series

Страница 1: ...C Station C Series S Series Charging System OPERATING MANUAL ...

Страница 2: ... S Series 3 3 S Series AC 3 4 C Series 3 5 C Station 3 6 Connector types 4 OPERATING INSTRUCTIONS 4 1 User Interface 4 2 Charging of electric vehicle 4 3 Adaptive EV Charging 4 3 1 Adaptive EV charging with democratic approach 4 3 2 Adaptive EV charging with arrival priority approach 4 4 Derating of the system in hot conditions 5 MECHANICAL DRAWINGS 5 1 Satellite post 5 2 CPU C501 C801 5 3 CPU C50...

Страница 3: ...ded it will result in wounds or fatal injury 1 2 Main risk factors Warning Do not turn OFF the charger if charging is ongoing as it may cause issues to the vehicle Follow user guide instructions for correct ending of the charging Warning Only qualified service personnel are allowed to carry out maintenance or installation work Warning Only an authorized electrician is allowed to carry out electric...

Страница 4: ... cables and charging connectors are changed immediately as they can cause risk of electical shock or fire The cable plugs and other electric devices may be installed or replaced only by an authorized electrician In case of any abnormal behavior of the equipment such as smoke coming from the CPU during normal use stop the use instantly turn the charger off and contact a MANUFACTURER service represe...

Страница 5: ...written in English Other language versions are translated from that document and MANUFACTURER cannot be held liable for errors in translation MANUFACTURER assumes no responsibility for any errors that may appear in the charging system if local rules and demands have been neglected In no event shall MANUFACTURER be liable for direct indirect special incidental or consequential damages of any nature...

Страница 6: ...e parts like cables and connectors are not included in the warranty 2 4 Manufacturer Kempower Oy Hennalankatu 71 15810 Lahti Finland 358 29 0021900 info kempower com C AND S OPERATION MANUAL EN 4 11 11 2021 1 07 ...

Страница 7: ...to a maximum of eight satellite posts Satellite posts with CCS1 CCS2 ChaDeMo and Type 2 AC charging plugs available Satellite posts feature 7 touch screen with on screen user guidance User authentication via RFID Radio Frequency Identification on each Satellite post The function can be switched on or off Internet cloud connection via built in Wi Fi and mobile data 3G 4G connection Charge status LE...

Страница 8: ...lugs and plug holders 1 2 7 Status light bars 2 Figure 1 Main points of the satellite post Depending on selected Satellite post one or two charging cable support system springs are providing cable support that prevents cable from touching the ground when the plug is in the holder C AND S OPERATION MANUAL EN 6 11 11 2021 1 07 ...

Страница 9: ... used 1 Blue Charging and state of charge 2 Red Fault 3 3 S Series AC Three types of S Series AC Satellites are available 2 x AC sockets CHAdeMO on the left hand side and AC socket on the right hand side AC socket on the left hand side and CCS2 on the right side C AND S OPERATION MANUAL EN 7 11 11 2021 1 07 ...

Страница 10: ...1 2 Figure 3 AC Satellite 3 4 C Series The C Series also known as cabinet The Charging Power Unit CPU consists typically 1 4 power modules 0 1 Dynamic Power Module Control module and Mains module which are fitted into racks of the cabinet C AND S OPERATION MANUAL EN 8 11 11 2021 1 07 ...

Страница 11: ...e 1 4 5 Power module channel status indicator 6 Power module circuit breaker 7 Power distribution module optional 8 Control module 9 ETH 1 Eth RJ 45 10 USB 11 ETH 1 8 to Sat Cab Eth RJ 45 to Satellite posts 12 Reset 13 Spare C AND S OPERATION MANUAL EN 9 11 11 2021 1 07 ...

Страница 12: ...over plate 15 Aux power circuit breaker 16 Main circuit breaker Figure 4 Main points of the cabinet 3 5 C Station C Station charging system consists one or two charging outlets C AND S OPERATION MANUAL EN 10 11 11 2021 1 07 ...

Страница 13: ...ug holder 7 Power modules 1 4 8 Place for power distribution module 9 Control module 10 MCB Auxiliary 11 Main circuit overload breaker Figure 5 Main points of the C Station Cable support system spring is providing cable support that prevents cable to touch the ground when the plug is on the holder C AND S OPERATION MANUAL EN 11 11 11 2021 1 07 ...

Страница 14: ...3 6 Connector types Figure 6 1 CCS Type 2 2 CHAdeMO 3 Type 2 C AND S OPERATION MANUAL EN 12 11 11 2021 1 07 ...

Страница 15: ...The different steps of the charging initialization are shown in here 2 Satellite post ID and status e g S1 status colors Green ready Blue charging Red fault 3 RFID activated Show tag 4 Charging protocol 5 Activity button 6 Info button 7 Stop button requires authorization when authorization is activated Figure 7 Start view of the touch screen C AND S OPERATION MANUAL EN 13 11 11 2021 1 07 ...

Страница 16: ...elds that change during each session 4 2 Charging of electric vehicle Prior to start DC charging the user needs to authorize charging session of the selected Satellite post Authorization can be based RFID card or tag Charging session 1 Select the correct charging plug that is appropriate to your vehicle 2 Attach the plug to the vehicle and ensure that the charging plug is properly inside the socke...

Страница 17: ...vehicle communicates with the charger 3rd step isolation test starts safety checks starts 4 th step isolation test passed safety checks completed and charging session starts 6 You may follow the charging progress with your smartphone by scanning the QR code from the charger display Touch screen may indicate SOC level how much energy was delivered an estimate of the range and charging time The char...

Страница 18: ...harger dynamic power management is one of the key elements on Adaptive EV charging Compared to the traditional static charging Adaptive EV charging can benefit from re routing the power channels even during each charging session It enables true flexibility to DC charging and improved OPEX as charging service power levels can also be adjusted to match with real time energy price level as well as to...

Страница 19: ...V is able to receive the charge at 150 kW power level it starts at that level As if the next EV also demands 150 kW both EVs receive only 100 kW And when the third arrives the power is split into three equal parts to 3 x 50 kW where 50 kW is booked to reserve And when the fourth EV arrives it will receive the remaining 50 kW charging power 4 3 2 Adaptive EV charging with arrival priority approach ...

Страница 20: ... is divided to half to two single channels 25 kW for both 2 and 4 outputs And as the EV on output 3 ends its session that power is routed to EV on outputs 2 75 and 4 25 Figure 12 When the EV that arrived earliest ends its charging session power channels are re routed to remaining EVs on arrival priority order In both power management cases democratic and arrival priority when there is free power f...

Страница 21: ... hot conditions In case of heatwave transformers and charging power units are subject to derating to protect themselves Should the ambient temperature increase and demand on charging be at high level charging power levels are automatically decreased C AND S OPERATION MANUAL EN 19 11 11 2021 1 07 ...

Страница 22: ...5 MECHANICAL DRAWINGS 5 1 Satellite post Figure 13 Dimensions of one and two charging connectors C AND S OPERATION MANUAL EN 20 11 11 2021 1 07 ...

Страница 23: ...5 2 CPU C501 C801 Figure 14 CPU C501 C801 C AND S OPERATION MANUAL EN 21 11 11 2021 1 07 ...

Страница 24: ...5 3 CPU C502 C802 Figure 15 CPU C502 C802 C AND S OPERATION MANUAL EN 22 11 11 2021 1 07 ...

Страница 25: ...5 4 CPU C503 C803 Figure 16 CPU C503 C803 C AND S OPERATION MANUAL EN 23 11 11 2021 1 07 ...

Страница 26: ...5 5 C Station Figure 17 Dimensions C AND S OPERATION MANUAL EN 24 11 11 2021 1 07 ...

Страница 27: ...nection type CCS1 CCS2 CHAdeMO Protection class IP54 Operation temperature 40 60 C note derating limitation Maximum humidity 95 relative humidity Cooling Power cabinet forced air satellite free air Height without optional steel foundation Cabinet 2150 mm Satellite 2300 mm Dimensions DxW ca without transformer multivoltage option 650 x 825 mm 1250 x 825 mm 1850 x 825 mm Weight CPU cabinet approx wi...

Страница 28: ...diesel petrol gas powered engine MCB Miniature Circuit Breaker fuse current overload PTA Public Transportation Authority cities PTO Public Transportation Operator bus operator PHEV Plug in Hybrid Electric Vehicle both ICE and electric driven QR code Quick response code RCD Residual Current Device safety RFID Radio frequency identification SOC State Of Charge battery s charging level UI User interf...

Страница 29: ...Kempower Oy Hennalankatu 71 P O BOX 13 15801 Lahti Finland Tel 358290021900 kempower com Subject to change without notice Kempower 2021 ...

Отзывы: