Before Installation

The Natural Draft Electronic Ignition (N.D.E.I.) flue 
system shall be installed by authorized personnel in 
accordance with the manufacturer’s installation 
instructions, local gas fitting regulations, municipal 
building codes, electrical wiring regulations, and any 
other statutory regulations. Contact your local building 
authorities about restrictions and installation inspections 
that may be required. If in doubt, contact your local 
dealer or Kemlan’s Head office. 

IMPORTANT AUSTRALIAN CODES:
•    Australian Standards AS 5601 Gas Installation
•    Australian Standards AS 3000 Electrical

Important Safety Notes

• Comply with all instructions in manual   

including clearances to combustible material.

•   Do not operate without fully assembling  

all components.

•   All open gas fires require ventilation into the

room.

•  Do not connect to any other air distribution duct or 

system.

•   An Australian approved cowl is required at flue

terminal. Cowls are made from ss304 2b materials.

•   Refer to the table below for flue diameter and flue 

cowl size.

•   Air movement of systems- A decorative gas log fire 

must not  be installed where the operation of any 
ventilation system, fan or air blower could in any 
circumstances cause the air pressure to be less than 
atmospheric at the appliance.

•   Do not block or restrict chimney.
•  After installing appliance check that the flue draws

well with smoke pellet.

•  Kemlan recommends that all gas fires be serviced

every year.

•   All gas units must be fitted by a licensed gas fitter.
•   It is the responsibility of the gas fitter to follow the

regulations set out in the Gas Code that dictate the 
procedures to follow when installing a gas appliance,
particularly regarding gas pipe sizing and checking of 
pressures.

• All Horizon gas appliances range are recommended 

to use Kemlan manufactured double flue system. 
Sizes depend on the appliance/s purchased. The 
active flue is manufactured using .55mm ss3o4 2B 
and the outer flues are manufactured using .55mm 
galvanised steel. All flues are 900mm long as 
standard.

Installation 

1

The N.D.E.I. system is supplied with all

required electrical fittings. Work needs to be  
undertaken by a licensed electrician if extending

wiring. Wiring requires clearance of minimum

100mm to flues and fireplace body due to heat. See  
Wiring diagram page 14. Wiring must be positively
secured away from heat source.

2    An isolation switch needs to be provided if 

connecting within fireplace framework.

3    Build frame to specifications provided. Note: 80mm 

clearance above fireplace and 5mm to front surface 
of firebox.

4    Unit located on 10mm fiber cement sheeting.
5    Unit and flues to be installed prior to plastering.
6    Gas line run to desired position prior to plastering.
7    Clearance of 25mm to vertical flue.
8    Allow for a minimum flue height of 3.6 m.
9   All flue components to be riveted together.
10  Rooms with Gas Open Fires require fresh air vents

of 400sq centimetres for each Decorative Gas, 
Coal Fire.

11 Important: Both caps to stay off if heatzone is not

used.

12 Important: if a heatzone kit with fan is used, the 

unused outlet must remain uncapped.

13 Vent (240mm x 90mm) supplied by Kemlan is 

required to ventilate chase to room

Rear clearances to 
combustible material

Low line: 25mm

WARNING:

Do not use an unlined masonry chimney as 
the flue for this appliance

Содержание 700 Low Line

Страница 1: ...25 02 2021 Ver 1 1 24 08 2017 Ver 1 1 Installation Instructions Horizon Three Sided Natural Draft Electronic Ignition Gas Fireplaces...

Страница 2: ...use 6 10 9 5 in AS NZS5601 1 2013 one or more ventilation openings with a combined free ventilation area of not less than the equivalent cross section area of the flue cowl shall be provided for each...

Страница 3: ...ter It is the responsibility of the gas fitter to follow the regulations set out in the Gas Code that dictate the procedures to follow when installing a gas appliance particularly regarding gas pipe s...

Страница 4: ...Ventilation size can be altered depending on the appliances Mj usage Vs the total room size the appliance is situated m3 this will be determined by a licensed gas fitter NOTE The chimney in which the...

Страница 5: ...LASS ONE SIDE IS OPTIONAL CEMENT SHEETING UNDER Z DETAIL Z USE EYELETS TO SUPPORT OPEN END TO FRAME ABOVE THREE SIDED A B C D E E1 F G H I 1100 LOW LINE 1274 480 870 435 10 12 450 135 10 15 1500 LOW L...

Страница 6: ...480 870 435 10 12 450 135 10 15 1500 LOW LINE 1670 490 1000 565 12 14 435 60 10 15 NOT INCLUDING 10MM FIBRE CEMENT SHEETING 285mm USE EYELETS TO SUPPORT OPEN END TO FRAME ABOVE SECTION VIEW Z Z Y Z Z...

Страница 7: ...to the eyelets the turn buckle can then be simply wound up to take the tension Tighten the turn buckle until both the top and bottom glass runners are parallel Removable glass panel can now be placed...

Страница 8: ...ONE ACTIVE FLUE CASING STANDARD VENT HOLES FULL WELD HEAT ZONE CONVERSION IMPORTANT VENTILATION INTO CHASE FROM VENT 240MM X 90MM SUPPLIED CEILING WITH 25MM AIR SPACE TO OUTER FLUE IMPORTANT BOTH CAPS...

Страница 9: ...ACE 10MM COMPRESSED FIBRE CEMENT SHEET BETWEEN UNIT AND BOTTOM SUPPORT FRAMING FRAMEWORK AND 10MM WALL LINING BY INSTALLER 150MM MIN 110MM MIN CEILING CEILING WITH 25MM AIR SPACE TO OUTER FLUE REQUIRE...

Страница 10: ...S1 Optional Heat zone ON OFF Switch S2 General Purpose Outlet GPO 2 x10 amp GPO S IMPORTANT IF HEATZONE KIT IS USED UNUSED OUTLET MUST REMAIN UNCAPPED CEILING SW 1 SW 2 Installation Instructions Keml...

Страница 11: ...2 x 3 1 4 x 3 0 90 2 4 700 Cantilever HCLC P L700 NAT GAS LPG 700 Mk2 Pebble 55 39 3 5 1 85 1 00 2 35 700 Mk2 Coal 55 39 3 5 1 85 1 00 2 35 700 Ironbark Log Mk4 55 39 3 5 1 85 1 00 2 35 1100 Cantilev...

Страница 12: ...ng off wall switch System does not have a high low burner switch Laying the fire Coal Pebble Evenly spread a bag of Vermiculite into the burner tray Tray should be completely filled to the top with Ve...

Страница 13: ...LES 1000 992 X 135 MARK 2 COALS 1400 1400 X 64 MARK 2 PEBBLES 1400 1400 X 64 MARK 2 COALS 1800 1800 X 64 MARK 2 PEBBLES 1800 1800 X 64 MARK 2 COALS 1000 992 X 135 MARK 2 PEBBLES 700 800 600 X 155 Inst...

Страница 14: ...large log has two holes on the underside to position in place 1 L O C AT E 4 C E R A M I C C OA L S Four ceramic coals are supplied with the burner base These coals must be laid in the position indica...

Страница 15: ...een 3 LOCATE LOG NO S 2 3 Two front log no s 2 and 3 are supplied to fit into the space between the metal frame and the ceramic base These logs do not cover the front burner ports but are designed to...

Страница 16: ...ght hand side of the burner with the right hand side of the logs positioned between the metal uprights of the grate Two pins are provided to firmly position these two logs onto the large rear log no 1...

Страница 17: ...uld assistance be required contact nearest agent E The gas burner is designed to work in a Kemlan Horizon electronic power flue ignition system Working correctly there will be no spillage Unit should...

Страница 18: ...ice information contact Kemlan Australia Head Office 13 French Avenue Brendale Queensland 4500 Telephone PH 07 3490 5500 TAIS 00 L140 D5 000V Installation Instructions Kemlan Three Sided Natural Draft...

Страница 19: ...CHECK FAN ON INDEPENDENT POWER SWITCH FAN COMES ON PILOT ON MAIN BURNER DOES NOT LIGHT 1 FLAME SENSOR NOT SENDING SIGNAL TO OPEN VALVE CHECK ELECTRODE IS IN PILOT FLAME CLEAN ELECTRODE CHECK ELECTROD...

Страница 20: ...BURNER SENDING SIGNAL TO OPEN VALVE FLAME CHECK ELECTRODE CONNETCTIONS CLEAN ELECTRODE CHECK ELECTRODE FOR DAMAGE REPLACE ELECRODE 2 MODULE NOT SENDING REPLACE MODULE SIGNAL TO OPEN VALVE 3 FAULTY VAL...

Страница 21: ...If a fault occurs the sequence of the flashing red light indicates the fault These codes are listed below The green light indicated the ignition box is sensing the flame Fan Forced Models The codes ab...

Страница 22: ...essure switch fault you can blow on the input to the switch and you should be able to hear it switch If you have a multi meter you can check if the switch is opening and closing as pressure is applied...

Страница 23: ...inted finish of the heater 2 4 Damage caused by water ingress 2 5 Cost of removal of defective heater or re installation of replacement heater 2 6 Failure to use fireplace components supplied by Kemla...

Отзывы: