13. If a remote controller has been installed, check that the
controller operates correctly (refer page 13 of
this manual).
PRIORITY
°C
BURNER ON
PRIORITY
°C
BURNER ON
ON/OFF
PRIORITY
HOT
COOL
MADE IN JAPAN
Main
ON/OFF
PRIORITY
HOT
COOL
MADE IN JAPAN
Shower
PRIORITY
°C
BURNER ON
ON/OFF
PRIORITY
HOT
COOL
MADE IN JAPAN
Ensuite
The gas continuous flow hot water system should now be
operating correctly.
Now that commissioning has been completed and the gas
continuous flow hot water system has been set up to operate
correctly, select the correct model number of the water
heater on page 5 of the user manual. Fill out your details, the
serial number, installation date and include any important
notes to the customer. The user manual is then to be handed
to the customer or left in a suitable location on the premises.
If the customer is available they are to be instructed on
the safe and correct operating of the water heater and any
auxiliary equipment.
If the hot water system isn’t going to be used for a long time
and needs to be turned off after commissioning, follow these
instructions:
• Switch off the electrical supply at the power outlet that
the water heater is plugged into
• Close the gas isolation valve located on the inlet to the
water heater
• Close the cold water isolation valve located on the inlet to
the water heater
Note: If there is a risk of freezing conditions, do not switch off
power to the water heater unless it is drained of water first.
Please see the section on freeze prevention on page 9 of the
user manual for more information.
Commissioning instructions
(continued)
Kelvinator Gas Continuous Flow hot water system
commissioning instructions 17
Содержание KGC20BNA
Страница 1: ...Gas Continuous Flow Hot Water System Installation Manual...
Страница 20: ...20 notes Kelvinator Gas Continuous Flow hot water system Notes...
Страница 21: ...Kelvinator Gas Continuous Flow hot water system notes 21 Notes...
Страница 22: ...22 notes Kelvinator Gas Continuous Flow hot water system Notes...