background image

729 S. Grove St., Delton, MI 49046
TEL: 269-623-6395 • 800-999-4320 FAX: 269-623-6398
[email protected] • www.keltech-inc.com

Installation 

215-1815 Rev. B; ECN 130011

© 2014 Keltech

Page 1 of 17 

10/17/2014

SNA-Series 

Tankless Heater Models

SNA-36 
SNA-54 
SNA-63 
SNA-72 
SNA-108 
SNA-126 
SNA-144

Voltage options 
for models: 
600V 3-phase 
480V 3-phase 
415V 3-phase 
400V 3-phase 
380V 3-phase

Table of Contents

Pre-Installation Information   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 2–3
Storage Instructions  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 3
Mounting Heater .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4
Plumbing Installation   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Electric Installation  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 6
Start Up Check List   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
Start Up   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8
Digital Controller Operation   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 9
Operational Test  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 10–11
TepidGuard

 Flow Conditions   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 11

Product Options   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 11–12
Maintenance .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 12
Troubleshooting   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 12–13
Special Installation & Operating Instructions   .  .  .  .  .  .  .  .  .  . 14–17

IMPORTANT!

Read this entire installation manual to ensure proper installation. When finished with 
the installation, file this manual with the owner or maintenance department. Compliance 
and conformity to local codes and ordinances is the responsibility of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding packaging material. If any parts are missing, do not begin installation until 
you obtain the missing parts.

Make sure that all water supply lines have been flushed and then completely turned off 
before beginning installation. Debris in supply lines can cause valves to malfunction.

Product warranties may be found on our web site www.keltech-inc.com.

Installation

THIS

SIDE

UP

Packing List

Содержание SNA-36

Страница 1: ...ptions 11 12 Maintenance 12 Troubleshooting 12 13 Special Installation Operating Instructions 14 17 IMPORTANT Read this entire installation manual to ensure proper installation When finished with the...

Страница 2: ...ntended service Frequency of cleaning and inspection depends upon local water conditions For heaters with adjustable output temperatures check and adjust as needed at initial installation and on a qua...

Страница 3: ...eaters from Rain or other falling precipitation via tarp or other waterproof media Runoff and accumulation of groundwater from any source that may exceed 1 inch NOTE For heaters with ENHT freeze prote...

Страница 4: ...mperature relief valve on hot water outlet immediately following the union NOTE Valve must empty into a drain See Figure 2 B Remove air by re installing drain plugs and open inlet supply valve to appl...

Страница 5: ...stem or at any drop to eliminate trapped air Components Needed 5 Union 1 1 4 Shutoff Valve Pressure and Temperature Relief Valve 150 psi Y Strainer 100 mesh or Inline Filter 150 microns 2 Gate or Ball...

Страница 6: ...rating for each heater CAUTION To avoid damage to the electronics or internal wiring do not perform any brazing or sweat soldering inside the enclosure ELECTRICAL SPECIFICATIONS FOR HEATER PHASE 3 Mo...

Страница 7: ...ief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point in the plumbing loop then an automatic air vent valve must be added at the high...

Страница 8: ...et shower etc then flush the system for 5 minutes to ensure all air is purged from the system CAUTION Failure to bleed air properly will damage elements and cause heater malfunction Be sure that plumb...

Страница 9: ...me page Advance Key Advances through parameter prompts Auto Man Off C r71 Turns Control Loop On Manual Off Disabled on SNA Models XX X h Pr1 Heater Power Disabled on SNA Models no AUt1 Autotune Contac...

Страница 10: ...e of approximately 10 psi For example if the high limit pressure is 40 psi adjust the low limit pressure to 30 psi with the pressure switch located on the supply pump Heater will not energize heating...

Страница 11: ...fault After turning on water then power test ground fault 1 Press GF Test button 2 Watch for ground fault light to illuminate and Bank Ready light s to shut off The Ground Fault system is active and...

Страница 12: ...he heat exchangers may trip at temperatures below 32 F on heaters equipped with ENHT or ENHT30 Manual resets are set to trip at 100 F 38 C Heat trace installed on connected piping can heat water to te...

Страница 13: ...dicated Bank 1 2 on the front bezel Bank 1 on the FLCB Bank 3 4 on the front bezel Bank 2 on the FLCB If the light is off and there is power on Check if water temperature is greater than 175 F Decreas...

Страница 14: ...nlet fitting here FIGURE 6 EXP2 EXP2LC Installation Notes 1 Any tubing conduit or fittings connected to the Pressurized Enclosure PE must conform to local codes for flammability ratings 2 All egress i...

Страница 15: ...ure and the protective gas supply The alarm actuator shall be mechanical pneumatic or electrical Electrical alarms and electrical alarm actuators shall be approved for the location in which they are i...

Страница 16: ...roved the interior of the PE is gas free and checked that the Pressurized indicator is green Commissioning Test Commissioning Leakage Compensation LC and Continuous Flow High Purge Keltech Options EXP...

Страница 17: ...larms function correctly Check the Relief Valve and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor Check the condition of the air supply filter element Clean or...

Отзывы: