background image

8

SNA-Series Tankless Heater

 Installation

10/17/2014 

Keltech • 

215-1815 Rev. B; ECN 130011

Start Up

5

A

Slowly turn on water supply to the unit 
with the enclosure door open .

C

Turn off the connected process and 
check the entire system to verify leak-free 
installation . 

G

Turn on the connected process; observe 
output temperature rise to setpoint . 

NOTE: 

Top portion of temperature controller 
displays output temperature, bottom 
displays setpoint temperature (setpoint 
temp is not adjustable on SNA Models).

D

Close enclosure door and secure . 
Depress the Emergency Stop Button . 

E

Energize the electrical service to the unit 
by switching on the breaker . 

F

Pull out Emergency Stop Button .  
After a six second discharge from the 
TepidGuard overshoot purge system, the 
unit is now in the ready-state .

B

Slowly turn on the water outlet valve, 
activate the connected process requiring 
heated water (faucet, shower, etc .), then 
flush the system for 5 minutes to ensure all 
air is purged from the system . 

CAUTION! 

Failure to bleed air properly will damage 
elements and cause heater malfunction.

Be sure that plumbing and electrical are complete per Start Up Check List.

IMPORTANT!  If your heater is mounted in an area where freezing temperatures are possible, an ENHT 

Freeze Protection Option should be specified. Heaters must be powered at all times to be 
Freeze Protected. If continuous power is not possible, do not allow the heater to remain 
full of water. Freezing of the heater can cause serious damage.

IMPORTANT!  If your heater has the EXP2 option and is located in a Class I Division II area, please review 

Special Installation & Operation Instructions section for all proper electrical connections 
and sealing to ensure the installation will provide the proper protection.

WARNING!  Make sure the breaker for the heater is OFF.

H

When startup is complete, leave circuit 
breaker in the ON position and the 
Emergency Stop Button on the door 
pulled out . The Green power light should 
be illuminated .

Содержание SNA-36

Страница 1: ...ptions 11 12 Maintenance 12 Troubleshooting 12 13 Special Installation Operating Instructions 14 17 IMPORTANT Read this entire installation manual to ensure proper installation When finished with the...

Страница 2: ...ntended service Frequency of cleaning and inspection depends upon local water conditions For heaters with adjustable output temperatures check and adjust as needed at initial installation and on a qua...

Страница 3: ...eaters from Rain or other falling precipitation via tarp or other waterproof media Runoff and accumulation of groundwater from any source that may exceed 1 inch NOTE For heaters with ENHT freeze prote...

Страница 4: ...mperature relief valve on hot water outlet immediately following the union NOTE Valve must empty into a drain See Figure 2 B Remove air by re installing drain plugs and open inlet supply valve to appl...

Страница 5: ...stem or at any drop to eliminate trapped air Components Needed 5 Union 1 1 4 Shutoff Valve Pressure and Temperature Relief Valve 150 psi Y Strainer 100 mesh or Inline Filter 150 microns 2 Gate or Ball...

Страница 6: ...rating for each heater CAUTION To avoid damage to the electronics or internal wiring do not perform any brazing or sweat soldering inside the enclosure ELECTRICAL SPECIFICATIONS FOR HEATER PHASE 3 Mo...

Страница 7: ...ief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point in the plumbing loop then an automatic air vent valve must be added at the high...

Страница 8: ...et shower etc then flush the system for 5 minutes to ensure all air is purged from the system CAUTION Failure to bleed air properly will damage elements and cause heater malfunction Be sure that plumb...

Страница 9: ...me page Advance Key Advances through parameter prompts Auto Man Off C r71 Turns Control Loop On Manual Off Disabled on SNA Models XX X h Pr1 Heater Power Disabled on SNA Models no AUt1 Autotune Contac...

Страница 10: ...e of approximately 10 psi For example if the high limit pressure is 40 psi adjust the low limit pressure to 30 psi with the pressure switch located on the supply pump Heater will not energize heating...

Страница 11: ...fault After turning on water then power test ground fault 1 Press GF Test button 2 Watch for ground fault light to illuminate and Bank Ready light s to shut off The Ground Fault system is active and...

Страница 12: ...he heat exchangers may trip at temperatures below 32 F on heaters equipped with ENHT or ENHT30 Manual resets are set to trip at 100 F 38 C Heat trace installed on connected piping can heat water to te...

Страница 13: ...dicated Bank 1 2 on the front bezel Bank 1 on the FLCB Bank 3 4 on the front bezel Bank 2 on the FLCB If the light is off and there is power on Check if water temperature is greater than 175 F Decreas...

Страница 14: ...nlet fitting here FIGURE 6 EXP2 EXP2LC Installation Notes 1 Any tubing conduit or fittings connected to the Pressurized Enclosure PE must conform to local codes for flammability ratings 2 All egress i...

Страница 15: ...ure and the protective gas supply The alarm actuator shall be mechanical pneumatic or electrical Electrical alarms and electrical alarm actuators shall be approved for the location in which they are i...

Страница 16: ...roved the interior of the PE is gas free and checked that the Pressurized indicator is green Commissioning Test Commissioning Leakage Compensation LC and Continuous Flow High Purge Keltech Options EXP...

Страница 17: ...larms function correctly Check the Relief Valve and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor Check the condition of the air supply filter element Clean or...

Отзывы: