background image

If a remote input switch is connected to the F29 select yes to this question

by pressing the 

button. Press the 

(P)

 button to lock your choice into memory

and to move to the next screen. You are then presented with a c

h

oice of 3

ways  the  remote  input  can  be  configured.  Press  the 

(^)

  or 

(v)

  buttons  to

move from one option to the next.

The  F29  houses  2  output  relays.  Relay  1  is  normally  used  to  control  a

pump.  Relay  2  is  normally  used  as  an  alarm  relay.  Selecting  yes  to  this

question  allows  you  to  configure  the  alarm  relay  to  close  its  contacts

under various conditions. If you want to use the alarm relay press 

(v)

 and

then press 

(P)

. Use the 

(^)

 or 

(v)

 buttons to move from one option to the

next.

CLOSED IF ANY FAULT DEVELOPS

 

Closed only on a genuine fault, open

at all other times.

CLOSED  ONLY  IF  FLOW  STOPS 

Closed  when  the  F29  detects  no  flow,

open at all other times.

CLOSED  WHENEVER  PUMP  IS  OFF

 

Closed  when  the  pump  is  stopped,

o

pen when the pump is running.

CLOSED  WHENEVER  PUMP  IS  ON

  Closed  when  the  pump  is  running,

open when the pump is stopped.

CLOSED DURING PRE-START DELAY

 

Only closed while the pre-start delay

timer is running.

CLOSED ON FAULTS NOT IN CYC RUN

 

Closed on all faults except those

detected during cyclic running. 

USE ALARM RELAY 

USE REMOTE INPUT 

Select this option if you are using a momentary contact switch or relay to

trigger  the  F29  and  cause  it  to  start.  The  remote  switch  can  open  its

contacts once the F29 has started or they can remain closed.

USE REMOTE FOR START ONLY

 

Select this option if you are using a 2 position high / low tank level switch to

control the F29. The F29 will be on when the remote switch is closed and off

when the remote switch is open.

USE REMOTE FOR START & STOP 

This selection replicates the function of the 

(R) 

button. Momentary closing of

the remote contacts causes the F29 to reboot.

USE REMOTE FOR SYSTEM RESETTING

25

Содержание F29 MK3

Страница 1: ...KELCO F29 MK3 INSTALLATION PROGRAMMING MANUAL DIGITAL PUMP CONTROLLER Engineering Pty Ltd Sydney Australia www kelco com au KELCO...

Страница 2: ...allation must always be carried out by a qualified pump engineer and all electrical work associated with this controller must be carried out by a licensed Electrician This industrial control device mu...

Страница 3: ...No 2 is closed and off when the remote is open This light is PURPLE when both remote inputs 1 2 are closed This F29 programmable flow switch has been fully tested and calibrated It is set to operate i...

Страница 4: ...ressing the P button holding it down for 1 second and releasing it takes you to the top of the menu Pressing and releasing the P button loads whatever the screen is displaying into the F29 s memory Th...

Страница 5: ...failure of the electronic components within the F29 Where possible install the F29 in a location that is sheltered from direct exposure to the weather The F29 is weatherproof and is supplied with a pr...

Страница 6: ...g saddle or pipe tee The F29 can be installed in either the suction or discharge pipework of the pump It is more common to install it in the discharge pipe either before or after the system s air cell...

Страница 7: ...9 into its on position The only change in state the flow switch will see will be the closing of the external pressure switch s contacts on a falling pressure Choose this arrangement if you want to kee...

Страница 8: ...pushes its paddle forward or each time pressure falls to whatever pressure you have set the external pressure switch to start at Choose this arrangement if you want the system to deliver a steady pre...

Страница 9: ...the pipework If a low flow rate is expected through the system the paddle should be cut longer perhaps until it only clears the bottom of the pipe by 3 to 5mm If you are unsure as to what length the...

Страница 10: ...a suitable spanner and the spanner flats provided on the paddle assembly directly above the process connection thread Under no circumstances should the electrical housing be twisted or used to screw...

Страница 11: ...grees to the axis of the pipework see sketch To secure the electrical housing onto the paddle assembly an Allen head cap screw is supplied The cap screw should be screwed fully through the hole provid...

Страница 12: ...the screw If you wind the adjustment screw out beyond 10 turns there will not be enough residual force to return the paddle to the off position when flow stops The range of sensitivity adjustment wil...

Страница 13: ...the HD terminal is linked to the normally open terminal of Relay 1 the HD drive in effect parallels a 42 Amp solid state switch across the relay s normally open contacts This increases the momentary c...

Страница 14: ...eter See sketch for assembling the cable gland components The F29 is supplied with a set of steel crimp rings The crimp rings are to provide strain relief for the controller s cables To use the crimps...

Страница 15: ...n the values given in the table The measurements expressed in the table represent the maximum required power with both relays 1 and 2 closed and the LCD backlight and all indicator lights on VOLTAGE L...

Страница 16: ...has S P D T contacts Relay 2 has S P S T normally open contacts Relay 1 is normally regarded as the pump control relay and relay 2 is normally regarded as the alarm relay With the HD terminal linked...

Страница 17: ...s the 2 remote connection wires with the external remote switch closed A mains voltage rated external switch with voltage free contacts such as a pressure switch tank level switch or a set of external...

Страница 18: ...imit The remote input to the F29 will operate properly provided the wires are separated by sufficient distance that the capacitance between them is less than 25nF Capacitance should be measured betwee...

Страница 19: ...NECTIONS CONNECTIONS FOR A SINGLE PHASE PUMP WIRING DIAGRAMS All electrical wiring associated with this controller must be carried out by a qualified Electrician Earth Link Optional voltage free exter...

Страница 20: ...ump motor as shown Do NOT use the HD link in 3 phase or single phase control circuit applications Remote switches with NO or NC voltage free contacts Supply 110 240VAC 50 Active Neutral Pump Motor 2 S...

Страница 21: ...1 Contactor 2 Contactor 1 WARNING Contactor coil rating must not exceed 240VAC N L1 L2 L3 3 Phase Pump Motor Contactor WARNING Contactor coil rating must not exceed 240VAC N L1 L2 L3 DUAL 3 PHASE PUM...

Страница 22: ...switch will be damaged The supply terminals are reverse polarity protected however the flow switch will simply not operate unless the supply polarity is correct If a remote switch is connected to the...

Страница 23: ...PUMP For a description of the functions of the buttons and lights please read pages 2 and 3 of this manual before proceeding This link wire must be used whenever the controller is directly controllin...

Страница 24: ...you do not specifically require as to do so will make the system s operation unnecessarily complicated and may introduce unpredictable interactions between the various functions 2 When changing major...

Страница 25: ...ow open at all other times CLOSED WHENEVER PUMP IS OFF Closed when the pump is stopped open when the pump is running CLOSED WHENEVER PUMP IS ON Closed when the pump is running open when the pump is st...

Страница 26: ...contacts and shut the generator set down On power up the start up timer ignores the F29 paddle and allows the pump to start despite an initial lack of flow The start up timer is factory set to 5 seco...

Страница 27: ...can be from 1 minute to 99 hours 59 minutes in increments of 1 minute To use batch control press followed by P BATCH CONTROLLER The pre start delay timer delays the starting of the pump each time the...

Страница 28: ...nsider a tank that has intermittent or irregular draw off You may choose to set the delayed restart to perhaps 12 hours At the end of the 12 hour period the pump will automatically start and if the ta...

Страница 29: ...f each other If a set running and stopping time are programmed in the flow switch will run the pump for whatever time it is set to and then stop for the time set on its stop timer If a run time is set...

Страница 30: ...runs dry the F29 will shut it down and wait for the period you have set before attempting to restart The ability to restart the pump automatically if it runs dry can be a very useful function Conside...

Страница 31: ...tween 2 and 50 starts Assuming you accept the default of 5 sequential starts then as a simple example of the way the anti cycling system works if starts per hour rate is set to 360 one start every 10...

Страница 32: ...cing the discharge flow by an amount equal to the pump s capacity The F29 will then display burst pipe detected on its LCD screen The leak detector only appears in the menu if you previously elected t...

Страница 33: ...includes an hour meter that keeps track of the total time a pump runs for The hour meter displays the total hours run for 2 seconds each time the pump stops It is viewable by watching the LCD screen...

Страница 34: ...a minimal maintenance device If it is correctly installed in a location that is out of direct exposure to the elements it should give a long and reliable life and require no maintenance at all Factors...

Страница 35: ...cts are unlike conventional flow and level switches and pump controllers in that they can be applied to virtually any fluid or pumping system in any manner defined by an original equipment manufacture...

Страница 36: ...and a return goods authorisation number to you The Kelco Products will be at the owner s risk whilst in transit to and from Kelco unless transported by Kelco or its authorised representatives The Kelc...

Отзывы: