12 

PA-939 Rev. B / October 2007

 

When performing the removal and installation procedures in this section or any maintenance on the system, 
lockout and tagout line power as follows:  

1.  Press the Emergency Off (EMO) button on the system cabinet door.  The location of the EMO is either on 

the front door or on a panel near the top of rack if the cabinet without the door is used. 

NOTE 

Details on the “Emergency Off (EMO) button” are in Section II. 

2.  Place the power switch for the PDU (Power Distribution Unit) in the OFF position.  The location of the PDU 

is in the bottom of the cabinet facing forward.  If two PDUs are present in the system, make sure to turn 
both power switches to the OFF position.  The second PDU is in the bottom of the cabinet facing to the 
rear. 

3.  If working in the system cabinet, disconnect the system cabinet line cord(s) from the AC line power 

receptacles. 

NOTE 

Larger S500 systems may have two Model 42000-PDU line cords.  When removing 

power, make sure to disconnect all system cabinet line cords from AC line power 
receptacles.  

4.  Verify that all power has been removed and discharged from the system cabinet. This can be done by 

switching the main power switch to the ON position. Verify that the green light does not illuminate. If light 
does not come on, the power is off. Turn main power switch back to the OFF position.  

5.  Lockout and tagout the system source power connection in accordance with your company’s lockout/tagout 

policy. Attach a standard clamshell type of lockout device with a key lock on the male end of the 
disconnected line cords. 

Installation and connections  

WARNING The 

following 

installation and connection procedures are to be performed by 

trained site installers who are familiar with the associated physical and 
electrical hazards.  

NOTE 

Larger S500 systems may have two Model 42000-PDU line cords. Plug each PDU 

line cord into a separate 15A or 20A circuit depending type of system. 

Position the system cabinet  

The system cabinet contains the controller and instrumentation for the test system. The cabinet is on casters 
allowing it to be rolled on a hard surface floor. The two steering casters in back swivel, while the two casters at the 
front are in fixed positions.  

1.  Carefully roll the system cabinet to its desired location next to the prober. Allow approximately 14 inches 

(nominal) of clearance between the cabinet and other instrumentation  

2.  Lock the casters by pushing down on the caster locking mechanisms located near the front-bottom of the 

cabinet.  

3.  Using the supplied wrench, adjust the height of the four legs such that the weight of the cabinet is on the 

legs and not on the casters. Adjust the legs so that the cabinet is level and does not wobble.  
If seismic securement is required, the legs adjacent to the four casters can be bolted to the floor. See the 
SIESMIC SECUREMENT section for details.  

 

 

Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176 - TestEquipmentDepot.com 

Содержание S500

Страница 1: ...uide PA 939 Rev B October 2007 www keithley com A G R E A T E R M E A S U R E O F C O N F I D E N C E S500 Administrative Guide PA 939 Rev B October 2007 99 Washington Street Melrose MA 02176 Phone 78...

Страница 2: ...This page left blank intentionally Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 3: ...replaced products are warranted for the balance of the original warranty period or at least 90 days LIMITATION OF WARRANTY This warranty does not apply to defects resulting from product modification...

Страница 4: ...This page left blank intentionally Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 5: ...onnection to Category I sources unless otherwise marked or described in the user documentation Exercise extreme caution when a shock hazard is present Lethal voltage may be present on cable connector...

Страница 6: ...date the warranty Instrumentation and accessories shall not be connected to humans Before performing any maintenance disconnect the line cord and all test cables To maintain protection from electric s...

Страница 7: ...on 4 Power distribution and EMO 6 A Site Preparation Installation 9 System cabinet size and weight 9 Line power requirements 10 System Power Dissipation 10 Environmental conditions 10 Triax connector...

Страница 8: ...S500 Administrative Guide ii PA 939 Rev B October 2007 Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 9: ...System 0 to 1 With 4200 SMUs 4210 SMUs 4200 CVU 4205 PG2s 4200 PIV and other 4200 options A flat panel display option must be chosen with a 4200 in the system Switching One of the following four choic...

Страница 10: ...test systems These are highly configurable and flexible instrument based systems intended to work with semi automatic and fully automatic probe stations for applications such as semiconductor device...

Страница 11: ...an emergency shutdown The power can only be turned back on by turning the EMO button to release it and toggling the power switch from ON to OFF EMO Reset and then back to ON again This reset operatio...

Страница 12: ...omponents Handle the connectors only by their bodies Do not touch the boards pins or terminals Any printed circuit board into which the device is to be inserted must first be grounded to the bench or...

Страница 13: ...oltage from the probe or other types of test fixture before handling 2 Shut down the computer 3 Place the system cabinet power switch to the OFF position 4 If cabinet has doors open them 5 Place the m...

Страница 14: ...EMO light stays on the power is not restored To restore power it may be necessary to push in and hold the Remote EMO Bypass switch until power has been restored to all units in the cell connected thro...

Страница 15: ...factory configuration always on and three strips of four switched outlets off only with EMO condition Control is through a 25 pin D sub connector WARNING Properly lockout tagout the system before begi...

Страница 16: ...oldering iron drill etc Use for equipment with hazardous voltages that need to be removed with the EMO circuitry Also see the note Outlet connector description contained at the end of this table 4 Gro...

Страница 17: ...able 3 See Floor plan for details on designing a floor plan for the system cabinet Table 3 System cabinet size and weight Weight Size width x depth x height Low End min configuration High End configur...

Страница 18: ...may result is test instability Additional details on 2600 overheating protection can be found in the Series 2600 System SourceMeter Reference Manual in the Overheating Protection section of the Sourc...

Страница 19: ...dicates a shock condition conduct a very thorough inspection of all components contained in the system cabinet Report any damage to the shipping agent immediately Crate 1 System cabinet The system cab...

Страница 20: ...tem source power connection in accordance with your company s lockout tagout policy Attach a standard clamshell type of lockout device with a key lock on the male end of the disconnected line cords In...

Страница 21: ...section of this guide lists the dimensions and weight of the system cabinet Figure 5 S500 floor plan top view 14 4 in 366 3 mm 23 7 in 601 2 mm 36 2 in 920 mm 38 1 in 967 7 mm System Cabinet 24 in 60...

Страница 22: ...ement Figure 7 shows the restraint brackets and bolt installation dimensions for the system cabinet Figure 8 shows how a floor mounting bracket is installed Keithley part numbers are included for the...

Страница 23: ...re 7 Seismic system cabinet restraints Figure 8 Floor mounting bracket installation B Specifications Refer to individual instrument documentation and specifications Test Equipment Depot 800 517 8431 9...

Страница 24: ...Calibration only Certificate of calibration required Data required attach any additional sheets as necessary Show a block diagram of your measurement system including all instruments connected whether...

Страница 25: ...This page left blank intentionally Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 26: ...s and trade names are the property of their respective companies A G R E A T E R M E A S U R E O F C O N F I D E N C E Keithley Instruments Inc Corporate Headquarters 28775 Aurora Road Cleveland Ohio...

Отзывы: