manualshive.com logo in svg
background image

S500 Administrative Guide 

 

  
PA-939 Rev. B / October 2007 

11 

Triax connector handling (contamination) 

Contamination can cause current leakage in the source-measure signal paths to the DUT. Leakage current can 
significantly degrade the test results. Care must be taken to keep source-measure triax cable connectors (if 
applicable) clean and free of any foreign contaminants.  DO NOT touch the connector pins of the triax connectors.  

CAUTION 

Contamination will degrade the performance of the test system.  To avoid 
contamination, DO NOT touch any connector pins or the areas adjacent to 
the electrical contacts of the triax connectors. 

Cleaning 

— Contaminated connectors can be cleaned with methanol, then blow drying with nitrogen gas. Allow 24 

hours to dry. 

Unpacking system components 

Carefully remove all system components from the crates. While unpacking, make sure there are no signs of 
damage to the components. Inspect shock sensors located on outside of shipping box. If the shock sensor 
indicates a shock condition, conduct a very thorough inspection of all components contained in the system cabinet. 
Report any damage to the shipping agent immediately. 

Crate 1 — System cabinet  

The system cabinet is shipped from the factory with all the instruments installed.  Most connections and wiring 
between the system cabinet instruments are made at the factory.  

Crate 2 (Optional) — Computer peripherals and other accessories  

A computer monitor, keyboard, and mouse. It includes required installation hardware, USB extension cables, 
connectors for the keyboard and mouse, and any other accessories that may have been ordered with the system. 

Lockout/tagout 

 

WARNING 

Disconnect the one or two system cabinet line cords from the AC line power 
receptacles before opening the system cabinet. Failure to remove line power 
before opening the cabinet exposes potentially high voltages to personnel. 
Severe personal injury due to electric shock may result if power is not 
removed before working inside the cabinet. Also, never power up the system 
until all connections and safety grounds are installed.  

 

 

Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176 - TestEquipmentDepot.com 

Содержание S500

Страница 1: ...uide PA 939 Rev B October 2007 www keithley com A G R E A T E R M E A S U R E O F C O N F I D E N C E S500 Administrative Guide PA 939 Rev B October 2007 99 Washington Street Melrose MA 02176 Phone 78...

Страница 2: ...This page left blank intentionally Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 3: ...replaced products are warranted for the balance of the original warranty period or at least 90 days LIMITATION OF WARRANTY This warranty does not apply to defects resulting from product modification...

Страница 4: ...This page left blank intentionally Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 5: ...onnection to Category I sources unless otherwise marked or described in the user documentation Exercise extreme caution when a shock hazard is present Lethal voltage may be present on cable connector...

Страница 6: ...date the warranty Instrumentation and accessories shall not be connected to humans Before performing any maintenance disconnect the line cord and all test cables To maintain protection from electric s...

Страница 7: ...on 4 Power distribution and EMO 6 A Site Preparation Installation 9 System cabinet size and weight 9 Line power requirements 10 System Power Dissipation 10 Environmental conditions 10 Triax connector...

Страница 8: ...S500 Administrative Guide ii PA 939 Rev B October 2007 Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 9: ...System 0 to 1 With 4200 SMUs 4210 SMUs 4200 CVU 4205 PG2s 4200 PIV and other 4200 options A flat panel display option must be chosen with a 4200 in the system Switching One of the following four choic...

Страница 10: ...test systems These are highly configurable and flexible instrument based systems intended to work with semi automatic and fully automatic probe stations for applications such as semiconductor device...

Страница 11: ...an emergency shutdown The power can only be turned back on by turning the EMO button to release it and toggling the power switch from ON to OFF EMO Reset and then back to ON again This reset operatio...

Страница 12: ...omponents Handle the connectors only by their bodies Do not touch the boards pins or terminals Any printed circuit board into which the device is to be inserted must first be grounded to the bench or...

Страница 13: ...oltage from the probe or other types of test fixture before handling 2 Shut down the computer 3 Place the system cabinet power switch to the OFF position 4 If cabinet has doors open them 5 Place the m...

Страница 14: ...EMO light stays on the power is not restored To restore power it may be necessary to push in and hold the Remote EMO Bypass switch until power has been restored to all units in the cell connected thro...

Страница 15: ...factory configuration always on and three strips of four switched outlets off only with EMO condition Control is through a 25 pin D sub connector WARNING Properly lockout tagout the system before begi...

Страница 16: ...oldering iron drill etc Use for equipment with hazardous voltages that need to be removed with the EMO circuitry Also see the note Outlet connector description contained at the end of this table 4 Gro...

Страница 17: ...able 3 See Floor plan for details on designing a floor plan for the system cabinet Table 3 System cabinet size and weight Weight Size width x depth x height Low End min configuration High End configur...

Страница 18: ...may result is test instability Additional details on 2600 overheating protection can be found in the Series 2600 System SourceMeter Reference Manual in the Overheating Protection section of the Sourc...

Страница 19: ...dicates a shock condition conduct a very thorough inspection of all components contained in the system cabinet Report any damage to the shipping agent immediately Crate 1 System cabinet The system cab...

Страница 20: ...tem source power connection in accordance with your company s lockout tagout policy Attach a standard clamshell type of lockout device with a key lock on the male end of the disconnected line cords In...

Страница 21: ...section of this guide lists the dimensions and weight of the system cabinet Figure 5 S500 floor plan top view 14 4 in 366 3 mm 23 7 in 601 2 mm 36 2 in 920 mm 38 1 in 967 7 mm System Cabinet 24 in 60...

Страница 22: ...ement Figure 7 shows the restraint brackets and bolt installation dimensions for the system cabinet Figure 8 shows how a floor mounting bracket is installed Keithley part numbers are included for the...

Страница 23: ...re 7 Seismic system cabinet restraints Figure 8 Floor mounting bracket installation B Specifications Refer to individual instrument documentation and specifications Test Equipment Depot 800 517 8431 9...

Страница 24: ...Calibration only Certificate of calibration required Data required attach any additional sheets as necessary Show a block diagram of your measurement system including all instruments connected whether...

Страница 25: ...This page left blank intentionally Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com...

Страница 26: ...s and trade names are the property of their respective companies A G R E A T E R M E A S U R E O F C O N F I D E N C E Keithley Instruments Inc Corporate Headquarters 28775 Aurora Road Cleveland Ohio...

Отзывы: