
Installation
2-9
2.6
Operating considerations
2.6.1 Using the thermal isolation container
After making all connections, place the preamplifier mod-
ule in the thermal isolation container, as shown in Figure
2-9. Route the connecting wires through the slits in each
end of the container, then cover the preamplifier with the
lid. Allow the preamplifier to thermally stabilize for at
least one hour to achieve rated accuracy.
2.6.2 Minimum operating distance
The Model 1801 preamplifier module should be kept a
minimum of two feet away from the Model 2001 Multi-
meter and other instrumentation to avoid noise pickup due
to stray magnetic fields.
Route
Input cable
through slit
Preamplifier Module
Route Power
Supply cable
through slit
Foam Thermal
Insolation Container
1801 NANOVOLT PREAMP
INPUTS
HI
LO
41V
PEAK
V ZERO
I ZERO
CAUTION:
NO INTERNAL OPERATOR SERVICEABLE PARTS,
SERVICE BY QUALIFIED PERSONNEL ONLY.
2mV
PEAK
KEITHLEY
!
Figure 2-9
Using the thermal isolator container
Содержание 1801
Страница 1: ...Model 1801Nanovolt Preamp Instruction Manual A G R E A T E R M E A S U R E O F C O N F I D E N C E...
Страница 71: ......
Страница 72: ......
Страница 73: ...A Specifications A 1...
Страница 74: ......
Страница 75: ......
Страница 76: ......