![KEHUA TECH iStoragE Series Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/kehua-tech/istorage-series/istorage-series_user-manual_3914925054.webp)
3 Installation
PV Energy Storage Inverter iStoragE Series
User Manual
46
All rights reserved ©Kehua Data Co., Ltd.
by rated power. For example, when the rated power of the inverter is 5kW, if the
anti-countercurrent power set to 30%, the set Smart feed-in control power is 1.5kW).
−
The pin illustration of smart meter is as shown in Table3-3.
Table3-3
Pin illustration of smart meter
Pin
Illustration
L
Connect to phase-L of GRID port in the inverter and phase-L of grid input.
N
Connect to phase-N of GRID port in the inverter and phase-N of grid input.
I+
Connect to I+ port of current transformer in the meter.
I-
Connect to I- port of current transformer in the meter.
5
RS485: A. Connect to RJ45's pin6 of COM. port in the inverter.
6
RS485: B. Connect to RJ45's pin5 of COM. port in the inverter.
The setting of the smart meter address is as shown in Figure3-43.
−
If the meter used in the PV inverter grid side, address is set to A-001.
−
If the meter used in the PV energy storage inverter grid side, address is set to A-002.
Home
PASS
P-0000
Code
Comm
Addr
Baud
Good
S-Yes
S-NO
SAVE
TPEP
PARIT
EF
A-001
Modify
Shift
Figure3-43
The setting of the smart meter address
The communication procedure of COM. port is as follows.
Step 1
Screw the waterproof cover on the COM. port, insert the RJ45 port to the COM. Port (as shown in
Figure3-44) and screw it.
Содержание iStoragE Series
Страница 1: ...PV Energy Storage Inverter iStoragE Series User Manual...
Страница 2: ......
Страница 89: ...4402 03766 001...