background image

Soda Carbonator 

 Keg Reactor Lid Instruction Manual 

 

Page 

2

 of 

7

 

www.KegLand.com.au 

Last Updated 25/10/2022 11:31 AM

 

 

Contents 

Warnings ............................................................................................................................................... 2 

No Pre-chill Initial Setup  (Consumption of less than 10L per day) ....................................................... 3 

Pre-chill Plumbing Options   (Consumption of more than 10L per day) ................................................ 5 

Pre-chill water with an inline keg ...................................................................................................... 5 

Pre-chill water with a glycol chiller ................................................................................................... 6 

Low Throughput (<10L per Day) 

 G40 Single Pass

 ........................................................................ 6 

High Throughput (>10L per Day) 

 G40 Double Pass

 ..................................................................... 7 

Expected time to carbonate after initial setup ..................................................................................... 7 

Plumbing options without access to a mains water supply .................................................................. 7 

 

Warnings 

1.

 

All plumbing which involves connection to a mains water supply must be 
undertaken by a licenced plumber. 

2.

 

Only use approved PE Water line for unregulated mains water and 4mm ID x 8mm 
OD EVA Barrier hosing or PE Water line for all other hosing in your system. 

3.

 

Install check valves between the regulator and the keg and between the inline 
regulator and the soda carbonator. 

4.

 

Ensure all hosing is cut with a clean and straight cut and that the hosing is pushed 
to its full depth into any push in fittings. Failure to do so may result in the hose 
coming loose or leaking. 

 
 

 

 

Содержание KL10955

Страница 1: ...ator Keg Reactor Lid Instruction Manual Page 1 of 7 www KegLand com au Last Updated 25 10 2022 11 31 AM Soda Carbonator Keg Reactor Lid Instruction manual KL10955 KegLand Distribution PTY LTD www KegL...

Страница 2: ...e after initial setup 7 Plumbing options without access to a mains water supply 7 Warnings 1 All plumbing which involves connection to a mains water supply must be undertaken by a licenced plumber 2 O...

Страница 3: ...the gas IN post using a ball lock gas disconnect 5 Set the pressure on the CO2 regulator to your desired carbonation level 30 50 psi A higher gas pressure correlates to a higher carbonation level and...

Страница 4: ...number of different ways that the soda carbonator could be setup differently to how it is shown above Pre chilling the water prior to it entering the carbonator keg will allow for a greater throughput...

Страница 5: ...m in your fridge then you can place a 19L keg in line with the carbonator keg The mains water is able to be pre chilled in the 19L keg prior to filling the carbonator keg This only requires a soda car...

Страница 6: ...don t have room in your fridge for a second keg then you can pre chill the mains water through a glycol chiller such as a G40 1 KL04114 The water which has run through the glycol chiller can then ente...

Страница 7: ...rs after the water is cold for it to be fully carbonated Plumbing options without access to a mains water supply If you do not have access to a mains water supply for example if you are using tank wat...

Отзывы: