KC-P30
Mounting and installation instructions
Installation manual V3.28
26
© KEBA
7) Insert the cable glands (surface-mounted cable insertion) or double-
membrane seals (flush-mounted cable insertion) into the corresponding
cable insertion openings.
The charging station is now ready for installation.
To mount the charging station, proceed as follows:
1) Mark the 4 holes
1
in the designated location on the wall. The supplied
drilling template can be used for this purpose.
Fig. 6-14: Drilling template
1
... Mounting holes
2
... Cable insertion openings
3
... Cable holder holes
2) If there is a cable holder, mark the cable holder holes
3
.
3) Drill boreholes and, if necessary, insert anchors in the holes.
1
... Washer for adjusting
2
... Rear wall of the charging station
3
... Washer for nut
4
... Nut
5
... Hanger bolt
x
... 20 mm