background image

As continuous product improvement occurs, specifications may be changed without notice.

DESCRIPTION

The Keating Instant Recovery

®

10×11 BB Fryer consists

of a frying vessel 10"×11", having a splash deck and a
splash back installed in a cabinet equipped with gas
burners and an automatic temperature control mechanism,
all arranged and designed for the proper frying of food.

SPECIFICATIONS
Fryer Vessel

shall be constructed from 18 gauge

stainless steel, shall have a shortening capacity of 26
pounds, shall be equipped with two 18 gauge stainless
steel horizontal heat transfer tubes spaced above the
bottom of the vessel so that the bottom is unheated and
the food particles collecting in this bottom zone are
unheated and therefor do not carbonize. The frying
vessel shall be polished to inhibit carbon build-up and
facilitate easy clean-up

The heat transfer tubes shall be

3" wide and 5" high. The bottom of the vessel shall slope
toward the front where it shall be equipped with a 1"
Teflon core 

1

/

4

turn, drain valve, so arranged that the

shortening can be drained into a receiving vessel placed in
front of the fryer.

Splashdeck

shall slope toward the shortening containing

vessel. 

The splash deck shall be made of 16 gauge 304

stainless steel.

Splashback

shall be made of 18 gauge 304 stainless

steel, shall completely cover the sides of the flue.

Cabinet: 

shall be made of 18 gauge stainless steel. The

cabinet shall be rigid in construction and shall have four 8"
adjustable legs. A door made of 22 gauge 304 stainless steel

shall cover the front of the cabinet and shall extend from the
bottom of the fryer to the panel, and above the panel shall be a
canopy. The door shall be the full width of the cabinet. No
additional space is required for the door to open a full 90
degrees. A stainless steel flue deflector is provided for installing

onto the flue back.

Heat Transfer Tubes

to be two, made of  stainless steel

polished to a #7 mirror finish. 

Thermostat

to be close range, hydraulic type and be

accurate to ±3°F from 300° to 350°F with stainless steel
bulb. Application of this thermostat is patented by
Keating.

Hi-Limit Control

to be manually resettable type with

stainless steel bulb.

100% Safety Shut Off

to be flame switch type with

combination control gas valve.

Melt Cycle

to be standard on "BB" fryers, allowing the

safe melting of solid shortening. Fryer is to be left in the
Melt Cycle mode until oil completely covers heat transfer
tubes.

Indicating Lights & Switches.

Power on switch, push to

light switch, pilot on light, fry off melt switch.

Standard Accessories

to include one pair 4 mesh baskets,

grid screen over heat transfer tubes, drain clean out rod,
sample of Keating Klenzer and Sea Powder.

Electrical Requirements:

Supply Voltage 120V 60Hz.

Control Voltage 24V 60Hz. 120 VAC 9ft. (1.5 m)
grounded cord set provided.

Gas Requirements

to install are 3/4" male NPT connection

and 4" water column pressures natural and 10" for LP gas at
the fryer burner manifold. Supply pressure to fryers must be
7” (natural gas) and 11” (LP) water column.

Special Order Options

may include battery, common

manifold, rear drain, casters, thermostat seals, portable
filter, central filter (CF SE14), cover, full size baskets,
security package, spark ignition.

INST

ANT RECO

VER

Y

®

FR

YER 

10×11 BB GAS

Printed in U.S.A.

10x11BBg2006

12/06

Oil

BTU

Ship

Model No. and Description

Capacity

Input

Height

Depth

Width

Wt.

10×11 BB Nat Gas

26 lbs.

54,000

46

1

/

2

"

26

1

/

2

"

12

3

/

8

"

125 lbs.

10×11 BB LP Gas

26 lbs.

50,000

46

1

/

2

"

26

1

/

2

"

12

3

/

8

"

125 lbs.

KEATING OF CHICAGO, INC.

Toll Free 1-800-KEATING 

www.keatingofchicago.com

10×11 BB GAS

Отзывы: