How to install
■
Wiring is required to follow the local wiring regulations.
Otherwise, it may cause fire.
■
Please select 60227 IEC 53 ordinary polyvinyl chloride sheathed cord.
Nominal cross-sectional area of conductors is 3×1.0mm
2
.
Otherwise, it may cause fire.
■
The product is not provided with Double pole switch and leakage protection
switch. Please purchase them in market.
■
It is required to use terminal
(
not supply
)
that complies IEC 60998 and
wiring box
(
not supply
)
that complies local regulation.
■
Wiring should be firmly connected without any loose.
3.Wiring
■
Connect the power cord
(
included earth
)
of product to lead wire in accordance with the wiring
diagram.
■
Make sure all connections are fastened firmly after finishing wiring.
Power cord
of the product
Lead wire
from source
Air curtain
Power cord
of the product
Green/Yellow
(
Earth
)
Earth wire
Power
supply cord
Terminal block
(
not supply
)
Live
(
L
)
Neutral
(
N
)
Brown
(
L
)
Blue
(
N
)
WARNING
Back panel
Mounting plate
Groove
1.Remove the product from the bottom holes.
2.Fixing the product.
Align the groove of back panel with both sides of
mounting plate. Fit the hooks into the top holes of
mounting plate.
3.Fasten the screws. (3 places)
4.Installation of product
Wiring box
(
not supply
)
Notice
The torque is suggested to be 1.2N·m.
Bottom holes
Top holes
7