27
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
7.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-
way valve’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Содержание KAM2-42 DN5
Страница 11: ...10 4 Wiring Diagram KAM2 42 DN5 KAM2 52 DN5...
Страница 12: ...11 KAM3 80 DN5 KAM3 62 DN5 KAM4 80 DN5...
Страница 13: ...12 KAM4 105 DN5 KAM5 105 DN5 KAM5 120 DN5...