kawneer.com
Laws and building and safety codes gover
ning the design and use of glazed
entrance, window
, and curtain wall pr
oducts vary widely
. Kawneer does not contr
ol
the selection of pr
oduct configurations, operating har
dwar
e, or glazing materials,
and assumes no r
esponsibility ther
efor
.
Kawneer r
eserves the right to change configuration without prior notice when deemed
necessary for pr
oduct impr
ovement.
© Kawneer Company
, Inc., 2011
14
(PART NO. 038-371)
EC 97904-38
NOVEMBER, 2011
PANELINE
®
EXIT DEVICE
SERVICE INSTRUCTIONS
PUSH PANEL HEIGHT ADJUSTMENT (Figure 4)
1. TO RAISE PUSH PANEL:
a.
Loosen (6) screws "A" and "B" on bottom of cross rail (See Figure 3).
b.
Tighten top screws "B" closest to center of push panel on each end until proper clearance is obtained
between the push panel and cross rail.
c.
Re-tighten (6) screws on bottom of cross rail.
d.
Tighten remaining (4) screws on top of cross rail.
2. TO LOWER PUSH PANEL:
a.
Loosen (6) screws "A" and "B" on top of cross rail (See Figure 3).
b.
Tighten bottom screws "B" closest to center of push panel on each end until proper clearance is obtained
between the push panel and cross rail.
c.
Re-tighten (6) screws on top of cross rail.
d.
Tighten remaining (4) screws on bottom of cross rail.
FOR PULL HANDLE SCREW ACCESS, TRAVELER ACCESS, DOGGING ASSEMBLY ACCESS
AND ROD LENGTH ADJUSTMENT, PROCEED PER INSTRUCTIONS BELOW.
FILLER PLATE REMOVAL (Figure 3):
1. Remove (2) screws "A" (one screw when filler plate is less than 1-1/2" (38.1) wide) from top and bottom of cross
rail closest to each door stile.
2. Use deglazing tool or similar device to hook filler plate and pull out (See Figure 3).
PUSH PANEL AND CHASSIS ASSEMBLY REMOVAL (Figure 3):
1. Remove (6) screws "A" and "B" from top and bottom of cross rail (See Figure 3).
2. Remove filler plates per instructions above.
3. Grasp push panel and chassis assembly and pull out (See Figure 3).
NOTE: FOR ROD LENGTH ADJUSTMENT SEE PAGE 6 & 7.
INSTRUCTIONS FOR ADJUSTING PRE-1989 PUSH PANEL ASSEMBLY