9
Electric Dispenser Hoist EWL 2, 3, 4
A 5.6 Mounting the threading rail
Move the carriage
1
in the direction of
the arrow up to the limit stop.
Lift the carriage
1
and load arm
3
in the
direction of the arrow using the
support tube and slide them in the direction
of the limit stop.
Swivel in the carriage
1
with swi-velling
part of the guide rail
2
in the direction of
the arrow up to the limit stop (parking
position).
Apply the threading rail
4
to the wall with
the plastic protection
p
central to the sup-
port rail
q
. Align horizontally / vertically
and mark holes.
Centre drill the marked holes
∅
6 mm.
Insert dowel plugs and screw on the
threading rail
4
.
Содержание EWL 2
Страница 1: ...Operating instructions Electric Dispenser Hoist EWL 2 3 4 Always on the safe side...
Страница 19: ...17 Electric Dispenser Hoist EWL 2 3 4 2322 mm 2480 mm 2137 mm 2540 mm SK 01 574...
Страница 21: ...19 Electric Dispenser Hoist EWL 2 3 4...
Страница 23: ...21 Electric Dispenser Hoist EWL 2 3 4...