Operating Manual
Original Operating Manual
17
Daily
Check all lines, hoses and connections for leakage and damage.
After 50h / every 500h thereafter
Check screws:
(13, 16) on the conduits (12).
(20) on the sideshifter housing (21).
(22) on the lower hooks (23).
(26) on the upper hooks (27).
(28) on the spacers (29).
Replace loose or damaged screws. Torque the screws as specified in Chapter 6.1
General.
Weekly
Grease:
Sliding pieces (2, 3) by way of the greasing nipples (1).
Sliding pieces (19) by way of the greasing nipples (18).
Supporting rollers on the lower hooks (25) as necessary.
Every 200h
Check wear on:
Sliding pieces (2, 3).
Sliding pieces (19).
bolt (14).
Supporting rollers (24).
As necessary
Renew worn sliders (19) by removing the hooks (23). Remove the complete. clamp
body (8)in the reverse order to that described in section 4.1. Replace the sliders (19).
During installation pay close attention that the sliders (19) are seated correctly. Then fit
the clamp as described in section 4.1.
Replace worn sliding pieces (3) by removing nut (6) from each cylinder (7). Separate
the hydraulic connection of the cylinder (10). Pull the arms (see Chapter 3.2) and slides
(9) out to the side. Remove the screw (4). Replace the sliders (3). When installing the
new sliders, make sure that the axial stops (5) are correctly seated. Remount the screw
(4). Push the arms and slides (9) into the clamping body (8) and connect the hydraulic
connection to the cylinder (10). Attach the nut (6) for the cylinder (7).