Ventilation
The heat generated within the CAP converter can be
dissipated from all sides of the casing. When selecting
the installation location, make sure that these sides are
not obstructed or covered. If the unit is operated contin-
uously with insufficient ventilation, this can negatively
affect the length of its working life!
Maintain a clearance of at least 20 cm above and below
the unit, 2 cm to either side and 5 cm behind and in
front of it, to allow unobstructed dissipation of the heat
generated.
Minimum
clearance
20 cm
2 cm
5 cm
5 cm
2 cm
NOTICE
Risk of material damage cased by insufficient ventilation!
The unit monitors its own temperature in operation. Continuous operation at temperatures higher than the
recommended operating temperature can cause premature failure of the unit as a result of insufficient venti-
lation. This does not constitute grounds for a claim under warranty/guarantee!
►
Operate the CAP converter only at the recommended operating temperature.
Connections and Fusing of the Unit
All the connecting cables for connection to the CAP converter are attached at the rear of the unit, see also Section
5.2.9, p. 27.
On the left-hand side of the CAP converter viewed from the front, there is a fuse inserted from the outside. This fuse
must be accessible even after the unit has been installed, so that it can easily be exchanged if required. For more infor-
mation about the fuse, see stickers on the CAP converter and the fuse.
Содержание MobiSet 3 Twin CAP 750
Страница 33: ...33 of 56 View after installation 45 View after installation 45 ...
Страница 53: ...53 of 56 14 Declaration of Conformity ...
Страница 55: ...55 of 56 ...