PM-100 PIPE MOUNT MANUAL
12
Pipe Attachment
1.
Slide the pipe down through the hole created between the blocks (H). The pipe should rest on the strut
plates below.
2. Tighten all hardware and ensure components are secure to the pipe without over-tightening.
3.
Slide the upper mount pipe bracket (B) over the pipe and cable. Ensure the notched end of the bracket is
down (or toward the pipe for a horizontal configuration).
• For ease of use, about keep about 1 foot of the pipe length above the upper mount assembly.
4.
Attach the upper mount lock handle (C). To prevent galling, apply a small amount of grease to the
threads of the lock handle.
5.
Tighten the upper mount lock handle (C) to secure the pipe’s vertical position.
MOUNT ASSEMBLY (CONT.)
H
Apply grease
Loosen
Tighten
B
C
3
4
Back to Contents