2HP-5HP AERATOR MANUAL
9
OPTIONAL BOTTOM SCREEN ASSEMBLY
Slide the power cord between the float and
screen where two float sections come together
before replacing the 3/8” lock nuts.
1
2
3
4
5
Optional Mesh Screen Attachment
If you are not using a mesh screen, proceed to step 6.
7
8
6
C
M
K
M
1.
Wrap the flat mesh (K) into a cone shape by overlapping both vertical edges by approximately 1 inch and
aligning the top and bottom edges of mesh.
2. Use three cable ties evenly spaced along the vertical seam to secure the mesh at the top, middle, and
bottom.
3.
Center the stainless steel bottom screen (M) inside the mesh cone with approximately 2 inches of mesh
above the steel screen's large ring.
4. Use three cable ties evenly spaced around the large ring to attach the mesh to the steel screen.
5. Use two cable ties placed opposite each other on the small ring to further secure the mesh to the
screen.
6. Place the aerator assembly inside the screen and raise the screen.
7. Remove the center three lock nuts (C) from the bolts and place
the bottom screen clips (L) over the bolts as shown.
8.
Position the clip flanges on either side of a vertical bar and
replace the inside lock nuts and tighten all nuts using the 9/16”
wrench and socket.
Back to Contents