5
A. GENERAL INFORMATION
a.1 General safety rules
ATTENTION PLEASE!!! You can never be too cautious: before the installation read and
comply with these fundamental Rules:
All local regulations, including those referring to national and European laws, must be
respected while installing the boiler.
Verify if the electrical system and the mains outlets are able to bear the maximum absorption of
the boiler, which is reported on the plate.
Connect the boiler to a norm-compliant, 230v – 50Hz mains outlet. Avoid using adapters,
multiple sockets or extensions.
Make sure the electrical system is provided with a norm-compliant earthing and differential
switch.
●
In order to install the boiler you must respect the current laws regarding the exhausting through
the flue. It is advisable to connect the boiler to the flue by a terminal, which should be easy to
inspect. We remind you that it is necessary to refer to an authorized assistance center for the
installation and periodical maintenance of the boiler, so to check the efficiency of the flue
draught, before and after the combustion work of the boiler.
●
The boiler consumes as much air as it is necessary for the combustion; it is thus advisable to
connect the boiler to the outside by a suitable piping, ending at the special slot on the back of
the boiler.
●
Given the weight of the boiler, before the installation, make sure the pavement is able to bear it.
●
If the pavement is made of inflammable material, such as parquet or carpeting, position a plate
under the boiler to protect it, (consider that, on the front of the boiler, the plate should exceed
the boiler by at least 25/30cm).
●
For your safety, it is advisable to maintain a distance of at least 20cm between the hot sides of
the boiler and possibly inflammable covering materials (such as glass-beaded walls, wallpapers
et cetera); otherwise, to use specific insulating materials, available on sale. Please make this
consideration also regarding the furniture, armchairs, curtains and so on.
●
In order to facilitate the possible interventions by the technical assistance, do not fit the boiler
inside closed spaces and do not place it adjacent to the walls, for this may compromise the
Содержание KK IDRO
Страница 1: ...PELLET BOILER KK IDRO OPERATING AND MAINTENANCE HANDBOOK...
Страница 13: ...13 100 100...
Страница 15: ...15 ELECTRICAL SCHEME...
Страница 31: ......