For Technical Support Call: 800-343-7486 Monday-Friday 7AM - 4 PM (PST)
Page 5
Installation Instructions
–
408SC
Step 3
–
Place Rack on Shell
•
Place rack on top of shell. Positon rack to you liking. Be sure the rack is off-set far enough to
the rear that one will not hit the shell when loading and unloading a ladder.
•
Be sure the handle can be rotated without hitting the side ofo the shell.
•
Mark four locations at each foot mount location onto the top of the shell.