22
English
5.906-709.0 Rev. 00 (11/14)
ABAS Uninstall/ install suction turbine cover
1 Cable mount
2 Screws
Remove inside cover.
Unscrew the screws.
Remove cable mount.
1 Cable mount
2 Power cord
3 Cable inlet
4 Ferrit ring (anti-interference ring)
5 Cable inlet
6 Connector
Detach power cord at the lustre terminal.
Remove power cord from the cable inlets.
Remove ferrite ring.
Route new power cord through the ferrite ring three
times prior to installation.
Service group does not contain any maintenance and in-
spection points.
The service group does not contain any peculiarities.
AHNK Uninstall / install power cable
050 Maintenance and inspection
060 Error diagnosis
Findings
Possible cause
Correction
070 Peculiarities/ others