Page 19 of 25
14.
AUTOMATIC RELEASE SYSTEM REPLACEMENT
14.1. Description
The automatic release system assembly is composed of a HAMMAR release system (A) and a
severable axis (B) fitted with a rubber washer (C).
14.2. Replacement
Refer to drawing next page.
Open the container and remove the beacon (
see § 8.2.2. Installation of beacon into container
).
(1) Unscrew the severable axis (B) while maintaining pressed down the ejection plate (D) of the
beacon and its blocking piece (E).
(2) Remove the automatic release system assembly.
(3) On the new HAMMAR release system, tick the new replacement date (actual month / year + 2
years. Example on drawing next page: release system replaced on Nov 2008, valid until Nov.
2010).
(4) (4)Press down the ejection plate (D) and maintain it pressed with its blocking piece
(E).(5)Screw the new automatic release system assembly in the screw of the blocking piece.
Put back the beacon into the container and close the container (
see § 8.2.2. Installation of beacon
into container
).Record the release system replacement,
page 23
of this manual.
Содержание SafeLink EPIRB
Страница 1: ...SAFELINK EPIRB User Manual ...
Страница 2: ...SafeLink Category 1 ...
Страница 3: ...SafeLink Category 2 ...
Страница 9: ...Page 4 of 25 ...
Страница 25: ...Page 20 of 25 ...
Страница 28: ...Page 23 of 25 RELEASE SYSTEM REMPLACEMENT Date Signature Next remplacement ...
Страница 31: ......