www.kg-groep.com page 11
12.2
D
AILY TESTING
(P
REMISES
M
ANAGEMENT
)
To be conducted by the Premises Management. Check that the panel shows no fire or fault
indications. If there are any fault conditions indicated, then follow instructions in section 11.
12.3
W
EEKLY TESTING
(P
REMISES
M
ANAGEMENT
)
To be conducted by the Premises Management.
▪
Perform a Lamp Test to check that all visual and audible indicators on the panel are functioning.
▪
When automatic fire detectors are involved bring NANO control panel in ONLY manual mode
▪
Test then at least one detector to confirm the operation of the control panel and the audible
alarms.
▪
Carry out an inspection of the extinguishing system according to the instructions of the supplier.
12.4
Q
UARTERLY TESTING
(C
OMPETENT
P
ERSON
)
To be conducted by the Competent Person. Included as reference for the Premises Management.
▪
Check all previous logbook entries and verify that any corrective actions had been taken.
▪
Carry out the weekly test.
▪
Check extinguishers conform the described test method 1 or 2 depending on the availability of
test plugs.
▪
Check the emergency power supply. Disconnect mains power (PSU1) of the NANO control panel
and verify that the emergency power (PSU 2) is functioning.
12.5
Y
EARLY TESTING
(C
OMPETENT
P
ERSON
)
To be conducted by the Competent Person. Included as reference for the Premises Management.
▪
Carry out the quarterly test.
▪
Test ALL fire detection devices and the manual release and hold buttons.
▪
The control panel case should be cleaned periodically by wiping with a soft, damp cloth.