12.2

 

D

AILY TESTING 

(P

REMISES 

M

ANAGEMENT

To be conducted by the Premises Management. Check that the panel shows no fire or fault 
indications. If there are any fault conditions indicated, then follow instructions in section 11. 

12.3

 

W

EEKLY TESTING 

(P

REMISES 

M

ANAGEMENT

To be conducted by the Premises Management.  

 

Perform a Lamp Test to check that all visual and audible indicators on the panel are functioning. 

 

When automatic fire detectors are involved bring NANO control panel in ONLY manual mode 

 

Test then at least one detector to confirm the operation of the control panel and the audible 
alarms.  

 

Carry out an inspection of the extinguishing system according to the instructions of the supplier.  

12.4

 

Q

UARTERLY TESTING 

(C

OMPETENT 

P

ERSON

To be conducted by the Competent Person. Included as reference for the Premises Management. 

 

Check all previous logbook entries and verify that any corrective actions had been taken. 

 

Carry out the weekly test. 

 

Check extinguishers conform the described test method 1 or 2 depending on the availability of 
test plugs. 

 

Check the emergency power supply. Disconnect mains power (PSU1) of the NANO control panel 
and verify that the emergency power (PSU 2) is functioning. 

12.5

 

Y

EARLY TESTING 

(C

OMPETENT 

P

ERSON

To be conducted by the Competent Person. Included as reference for the Premises Management. 

 

Carry out the quarterly test. 

 

Test ALL fire detection devices and the manual release and hold buttons. 

 

The control panel case should be cleaned periodically by wiping with a soft, damp cloth. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание NANO MARINE

Страница 1: ...www KG Groep com January 1 2023 version 1 0 Owner s manual NANO MARINE FIRE DETECTION EXTINGUISHING CONTROL SYSTEM...

Страница 2: ...6 EXTINGUISHING RELEASE 6 9 LED INDICATORS 7 9 1 MANUAL RELEASE ONLY 7 9 2 AUTOMATIC MANUAL RELEASE 7 9 3 POWER 7 9 4 COMMON FIRE 7 9 5 FIRE ZONE ALARM 7 9 6 EXTINGUISHING RELEASED 8 9 7 EXTINGUISHING...

Страница 3: ...abinets engine rooms in vessels yachts and other small areas or equipment The NANO MAR SYSTEM continuously senses its inputs and in the event of a fire gives the correct output to enable a product spe...

Страница 4: ...depending on the DIP switch time settings In a marine application it is NOT common for a fire suppression system intended for an engine room to be released by an automatic fire detector But the NANO c...

Страница 5: ...nt of a complete power failure the general fault relay becomes inactive 6 7 VFC FIRE RELAY ACTIVE IN SINGLE OF DUAL MODE ALARM A single or dual FIRE indication can trigger the VFC relay You can choice...

Страница 6: ...d button as long this button is pressed the extinguishing release sequence will be halted and cause the yellow hold activated indicator flash Release the Hold button shall re start the countdown relea...

Страница 7: ...differently indicating an abnormality in the power supply to the NANO control panel When starting the NANO MAR SYSTEM after a power failure or an extinguishers release the green power LED on the NANO...

Страница 8: ...ators flash This yellow fault indicator will light continuously at any fault condition or power malfunction 9 9 FIRE ZONE FAULT When the NANO control panel has detected an error in one of the critical...

Страница 9: ...m Note the time the fire alarm occurred and log the fire event in the logbook 11 2 WHAT TO DO IN THE EVENT OF A FAULT CONDITION Note the indications on the front of the NANO control panel Note the tim...

Страница 10: ...sconnect extinguisher MOVE the disconnect switch of all in the YES position and the aerosol extinguisher is disabled and can not be activated A disablement will be signalized as fault on the NANO cont...

Страница 11: ...ystem according to the instructions of the supplier 12 4QUARTERLY TESTING COMPETENT PERSON To be conducted by the Competent Person Included as reference for the Premises Management Check all previous...

Страница 12: ...itness for a particular purpose It is the responsibility of the premises management to define the fire procedures and ensure that all relevant users are trained and that fire drills are performed with...

Отзывы: