Venkon
Assembly, installation and operating instructions
43
Condensation water connection
Check whether the unit is connected leak-free to the on-site condensation connection.
Check whether the waste water lines are clean and have a sufficient gradient.
Check whether the condensation pump has a working power supply.
Once all checks have been completed, initial commissioning can be carried out in line with Kapitel 9 „
Maintenance
“.