Venkon
Assembly, installation and operating instructions
17
6.2
Requirements governing the installation site
Only install and assemble the unit if the following conditions are met:
Make sure that the wall/ceiling is sufficiently load-bearing to take the weight of the unit (
).
Make sure that the ceiling is sufficiently load-bearing to take the weight of the unit (
Make sure that the unit is securely suspended/standing.
Ensure that the airflow can circulate freely.
Provide adequate space for flow and return water connections on site (
Connection to the pipe network [
).
There is a power supply on site (
Maximum electrical rating values [
If need be, provide a condensation connection with a sufficient gradient on site.