Venkon
Assembly, installation and operating instructions
17
6.2
Requirements governing the installation site
Only install and assemble the unit if the following conditions are met:
Make sure that the wall/ceiling is sufficiently load-bearing to take the weight of the unit (
).
Make sure that the unit is securely suspended/standing.
Ensure that the airflow can circulate freely.
Provide adequate space for appropriately sized flow and return water connections on site (
There is a power supply on site (
Maximum electrical rating values [
If need be, provide a condensation connection with a sufficient gradient on site.
Содержание Venkon 61
Страница 2: ......
Страница 86: ...Venkon Assembly installation and operating instructions 86 13 Certificates...
Страница 90: ......
Страница 91: ......