Personnel requirements - Qualifications

Expertise

The installation of this product requires specialist knowledge of heating, cooling, ventilation, in-
stallation and electrical engineering.

Damage caused by improper installation is the responsibility of the operator or installer. The in-
staller of these units should have adequate knowledge of the following gained from specialist
professional training

Safety and accident prevention regulations
Country-specific guidelines and recognised technical regulations, i.e. Association of German
Electricians (VDE) regulations, DIN and EN standards.
VDI 6022; maintenance personnel must be trained to Category B (possibly Category C) to
comply with hygiene requirements (as required).

2.5

Personal Protective Equipment

Personal protective equipment is used to protect people from impaired safety and health when
working with the unit. The applicable accident prevention regulations at the place of use apply
in all cases.

3

Transport, storage and packaging

3.1

General transport instructions

Check on delivery for completeness and transport damage.

Proceed as follows in the event of visible damage:

Do not accept delivery or only accept with reservations.
Record any transport damage on the transportation documents or on the transport company's
delivery note.
Submit a complaint to the freight forwarder.

IMPORTANT NOTE!

Warranty claims can only be made within the applicable period for complaints.
(More information is available in the 

T&Cs

 on the Kampmann website)

IMPORTANT NOTE!

2 people are needed to transport the unit. Wear personal protective clothing
when transporting the unit. Only lift the unit on both sides and not by the pipes /
valves.

IMPORTANT NOTE!
Material damage caused by incorrect transport!

Units being transported can drop or topple over if transported wrongly. This can
cause serious material damage.

Proceed carefully when unloading the equipment on delivery and when
transporting it on site and note the symbols and instructions on the pack-
aging.
Only use the holding points provided.
Only remove packaging shortly before assembling the unit.

4

Installation and wiring

4.1

Requirements governing the installation site

Only install and assemble the unit if the following conditions are met:

Make sure that the wall/ceiling is sufficiently load-bearing to take the weight of the unit.
Make sure that the unit is securely suspended/standing.
Ensure that the airflow can circulate freely.
Provide for adequate space for floor and return water connections on site.
There is a power supply on site.
If need be, provide a condensation connection with a sufficient gradient on site.

4.2

Minimum clearances

min. 2 m

min. 2 m

min. 2 m, max. 3 m

4.3

Installation

2 people are needed to install the unit.

CAUTION!
Risk of injury from sharp metal housing!

The inner metal of the casing can have sharp edges.

Wear suitable protective gloves.

IMPORTANT NOTE!
Horizontal installation of units!

When installing the units, ensure that they are completely horizontal to ensure
proper operation.

IMPORTANT NOTE!
Avoid draughts!

Consider the occupied zone when installing/suspending the units. Do not expose
people to the direct air flow. Position the unit accordingly and adjust the air out-
let if required.

IMPORTANT NOTE!
Sound insulation

Provide for sound isolation between the and the adjacent building if required.

IMPORTANT NOTE!
Install connections in the de-energised state!

Connections must be installed without tension!

Use a suitable tool to protect terminal nuts from being sheared off and
twisted.

1) Drill four fixing holes (refer to drilling spacings) into the load-bearing ceiling, insert

dowels and fit the appropriate M8 threaded rods.

2) Using M8 fender washers and nuts, fix the threaded rods to the four corresponding fix-

ing brackets on the unit and secure them in place (with self-locking nuts or locknuts).

3) Then dismantle the design panel from the supply lines:

4) open the design panel by pulling on the notches.

5) Push the securing panel inwards to unlock the design panel and open it fully. 

CAU-

TION:

 When opening/removing the design panel, do 

NOT

 allow the opening angle to

exceed 90° to prevent damage!

6) Unlock the hinges on the right and left by pulling on them and remove the design

panel.

23

Содержание KaDeck

Страница 1: ...Betriebsgrenzen Wassertemperatur min max C 4 80 Luftansaugtemperatur min max C 6 40 Luftfeuchte min max 20 60 Betriebsdruck min bar kPa Betriebsdruck max bar kPa 16 1600 Glykolanteil min max 0 50 Bet...

Страница 2: ...erwenden Verpackungen erst kurz vor der Montage entfernen 4 Montage und Anschluss 4 1 Voraussetzungen an den Aufstellort Das Ger t nur montieren wenn folgende Bedingungen erf llt sind Die Wand Decke m...

Страница 3: ...ob alle Zu und Ablaufleitungen ordnungsgem ausgef hrt sind Rohrleitungen und Ger t mit Wasser f llen und entl ften Pr fen ob alle Entl ftungsschrauben geschlossen sind Dichtigkeit pr fen Abdr cken un...

Страница 4: ...ts of operation Min max water temperature C 4 80 Min max air intake temper ature C 6 40 Min max air humidity 20 60 Min operating pressure bar kPa Max operating pressure bar kPa 16 1600 Min max glycol...

Страница 5: ...ing Only use the holding points provided Only remove packaging shortly before assembling the unit 4 Installation and wiring 4 1 Requirements governing the installation site Only install and assemble t...

Страница 6: ...all supply and drainage lines have been properly connected Fill pipes and unit with water and bleed Check whether all bleed screws are closed Check leak tightness pressure test and visual inspection...

Страница 7: ...e d eau min max C 4 80 Temp rature d aspiration d air min max C 6 40 Humidit de l air min max 20 60 Pression de fonctionnement min bar kPa Pression de fonctionnement max bar kPa 16 1600 Proportion de...

Страница 8: ...tenir compte des symboles et indications figurant sur l emballage Utiliser uniquement les points de fixation pr vus cet effet Attendre le moment du montage pour retirer l emballage 4 Montage et racco...

Страница 9: ...t Contr les c t eau V rifier que toutes les conduites d amen e et d vacuation sont mont es correctement Remplir et purger les tuyaux et l appareil d eau V rifier que toutes les vis de purge sont ferm...

Страница 10: ...n max C 4 80 Temperatura dell aria aspirata min max C 6 40 Umidit dell aria min max 20 60 Pressione di esercizio min bar kPa Pressione di esercizio max bar kPa 16 1600 Percentuale di glicole min max 0...

Страница 11: ...izzare solo i punti di aggancio previsti Rimuovere gli imballaggi solo poco prima del montaggio 4 Montaggio e collegamento 4 1 Requisiti per il luogo di installazione Montare l apparecchio solo se le...

Страница 12: ...alimentazione e di scarico sono realizzate correttamente Riempire di acqua e sfiatare le tubazioni e l apparecchio Verificare se tutte le viti di sfiato sono chiuse Controllare la tenuta mediante cad...

Страница 13: ...igtemperatuur min max C 6 40 Luchtvochtigheid min max 20 60 Bedrijfsdruk min bar kPa Bedrijfsdruk max bar kPa 16 1600 Glycolpercentage min max 0 50 Bedrijfsspanning 230 V 50 60 Hz Vermogensopname stro...

Страница 14: ...rvoor bestemde aanslagpunten Verwijder verpakkingen pas kort v r de montage 4 Montage en aansluiting 4 1 Voorwaarden voor de opstelplaats Monteer het apparaat alleen wanneer aan de volgende voorwaarde...

Страница 15: ...nvoer en afvoerleidingen goed zijn aangelegd Vul de leidingen en het apparaat met water en ontlucht deze Controleer of alle ontluchtingsschroeven gesloten zijn Voer een lektest uit afdrukken en visuel...

Страница 16: ...e min maks C 6 40 Wilgotno powietrza min maks 20 60 Ci nienie robocze min bar kPa Ci nienie robocze maks bar kPa 16 1600 Zawarto glikolu min maks 0 50 Napi cie robocze 230 V 50 60 Hz Pob r mocy pr du...

Страница 17: ...wek na opakowaniu Stosowa wy cznie punkty mocowania przeznaczone do tego celu Opakowanie zdj dopiero bezpo rednio przed monta em 4 Monta i pod czenie 4 1 Wymagania wzgl dem miejsca monta u Urz dzenie...

Страница 18: ...odnie ze schematem po cze Kontrola po stronie wody sprawdzi czy wszystkie przewody dop ywowe i odp ywowe s prawid owo wykonane Rury oraz urz dzenie nape ni wod i odpowietrzy sprawdzi czy wszystkie rub...

Страница 19: ...1 1 2 3 4 5 6 7 KaDeck 1 2 3 4 5 6 7 2 QR EN 60335 1 2 1 2 2 19 2 2 C 4 80 C 6 40 20 60 16 1600 0 50 230 50 60 2 3 Kampmann GmbH Co KG Friedrich Ebert Str 128 130 49811 Lingen Ems T 49591 7108 0 E in...

Страница 20: ...KaDeck 20 2 4 VDE DIN EN VDI 6022 B C 2 5 3 3 1 Kampmann 2 4 4 1 4 2 2 2 2 3 4 3 1 M8 2 M8 3 4 5 90 6 23...

Страница 21: ...KaDeck 21 4 4 2 2 2 4 2 4 1 2 2 2 3 4 5 6 5 DIP...

Страница 22: ...KaDeck 22 6 6 1 6 2...

Страница 23: ...23 1 31 1 24 4 7 7 7 7 790 620 195 195 2 3 4 5 6...

Страница 24: ...24 7 8...

Отзывы: