- 13 - 

KALVIS-100MG ... -500MG      LT      2019.03.18

 

 

5.2.  Connecting to heating system 

Boiler has to be connected to the heating system and electric power network in accordance with the project 

prepared  by  the  projecting  body,  taking  into  account  the  principal  diagram  of  boiler  connection  to  heating 
system given in the 

Burner control unit PLUM ecoMAX850P2-O (or KEY RK-2006LPGP2)  for Pellet Boilers 

Installation,  Maintenance,  Service  And  Operation  Manual

“.  In  order  to  ensure  long  service  life  of  the  boiler, 

layout ensuring the necessary return water temperature has to be used.  

If  the  difference  of  supply  and  return  water  temperatures  is  over  25  °C  (showing  insufficient  water 

circulation  in  the  heating  system),  this  may  mean  that  the  boiler  would  be  unable  to  work  at  full  power, 
because  it  heats fast  (especially its  upper part  where temperature sensors are installed).  In this case burner 
controller fan blows air to the hearth and “stops” the boiler, the boiler is forced to “wait” till the slow water flow 
removes the produced heat.  

Optimum volume of water, flowing through the boiler, is given in 

Table 1

 of this  manual and is calculated 

when the difference between the mentioned temperatures is 20 °C. 

During boiler stoking, forced heat carrier circulation is a must. 
Water to fill the heating system has to undergo special preparation in accordance with 

LST EN 12953-10

 or 

similar standard of the user country. 

After  having  installed  the  heating  system  and  filled  it  with  water  (at  static  pressure),  visually  inspect  the 

boiler and the places of its connection to the heating system. 

If there are no water leaks, for testing, raise pressure in the boiler up to  1,5 of operating pressure, in this 

case 6,0 bar (0,6 MPa), and maintain it for at least 5 minutes. If, as a result, there are no leaks or weeping at 
maintained pressure, this means that the boiler is fit for operation.  

After  completion  of  the  test,  reduce  pressure  in  the  system  down  to  the  operating  pressure,  taking  into 

account that when water heats up and expands, pressure will grow up. 

For protection from overpressure, 2 protective valves have to be provided, with the following parameters: 

  Pressure: 4,0 bar; 

  Valve diameter Ø: G 1¼`. 

 

Protective valves of the boiler have to be installed on the branch pipes welded in supply water pipe before 

boiler closing valve. 

 

5.3.  Connecting electrical part of the boiler 

  Boiler controller with emergency thermostat is installed in the rear part of the boiler and control unit which is 

connected via cable, can be fixed by magnets onto the boiler in the place convenient to use.  

  Boiler body has to be grounded according to the requirements of electrical equipment installation rules. 

  Installation works have to be carried out in accordance with the prepared project. 

  Electrical  part  connection  works  can  be  carried  out  by  the  person  having  electricia

n’s  qualification  and 

possessing the permission-licence for execution of installation works. 

  Works have to be carried out with supply power off observing the requirements of occupational safety.  

 

Additionally, there is an option to connect to the controller the following elements of the heating system: 

temperature  sensors;  system  recirculation  pump;  mixing  T-valve;  hot  water  (boiler)  pump,  etc.  For  more 
information look in 

Burner control unit PLUM ecoMAX850P2-O (or KEY RK-2006LPGP2)  for Pellet Boilers 

Installation, Maintenance, Service And Operation Manual

““.

 

 

 

Before installation or cleaning of the burner, make sure that its power cable is disconnected!  

 

 
 

 

 

Fig. 6. 

Connection of draught measurement tube.   

When installing the control panel on the other side of the boiler, turn the blind with T-valve to the opposite side of the boiler. 

 

Содержание Kalvis-100MG

Страница 1: ...SOLID FUEL WATER HEATING BOILER WITH PELLET BURNER KALVIS 100 MG 500 MG INSTALLATION AND SERVICE MANUAL LST EN 303 5 2012 20548 87 20548 93 Made in Lithuania Made in Lithuania...

Страница 2: ......

Страница 3: ...use it contact the seller Legend Important information or useful suggestions on installation or operation of the product Warnings about concerns for your health or property safety and correct operati...

Страница 4: ...ical part of the boiler 13 5 4 Boiler commissioning 14 6 Boiler operation 14 6 1 Preparation for work 14 6 2 Fuel container filling 14 6 3 Stoking 15 6 4 Maintenance 15 6 5 Boiler equipment servicing...

Страница 5: ...em with water The water in the heating system and boiler should not freeze up When boiler is in operation to close supply and return line valves To change the design of the boiler It is necessary to c...

Страница 6: ...dangerous for further boiler operation or operating personnel vibration knocks inside the boiler noise exhaust gas explosions in the pipeline damaged fittings pipes etc In the case of sooth and fuel p...

Страница 7: ...n note has to be made in this document under Installation Report Installed and connected boiler has to be checked by fire fighters It is strongly prohibited to fire the boiler without having filled it...

Страница 8: ...ed according to the requirements of STR 2 01 02 2016 Projecting and Certification of Energy Performance of Buildings expressed for Energy Performance of Buildings Classes B and C 3 Using 8 wood pellet...

Страница 9: ...burner L1 mm mm 1140 5 2990 5 1260 3110 1420 3350 1420 3650 Mass no more than 10 kg 2500 5 2580 3000 3420 1 Wood pellet quality shall be in line with DIN 51731 DIN plus standards 2 Energy quantity ca...

Страница 10: ...orative panels 21 Ash container 22 Actuator for ash from boiler extraction auger 23 Protective screw connecting the ash removal auger with its actuator 24 Tray for ash from the boiler 25 Water outlet...

Страница 11: ...stallation in the hearth door Distances from partitions are given in the boiler house project For maintenance of turbulizers and ash removal auger extraction leave a sufficient distance in front of th...

Страница 12: ...iler on separate branches shall have smoke exhauster see fig 5 C It is prohibited to install one smoke exhauster for two or more boilers see fig 5 D Multicyclone is used to separate ash and other soli...

Страница 13: ...east 5 minutes If as a result there are no leaks or weeping at maintained pressure this means that the boiler is fit for operation After completion of the test reduce pressure in the system down to th...

Страница 14: ...peration In order to ensure proper operation of the equipment make sure to study all given boiler burner and control unit manuals 6 1 Preparation for work When firing the boiler it is necessary to che...

Страница 15: ...ation about burner operation and control When boiler is operating in a stabile mode make sure that there are no water leakages knocks hydraulic shocks or penetration of discharged combustion products...

Страница 16: ...ed via dismountable joints Dismountable joints are mounted as follows open the door of heat exchanger at a minimum just to insert hand take off each turbulizer and insert part of its dismountable join...

Страница 17: ...3 Smoke temperature is too high Heat exchanger is sooty Clear sooth away from hearth surfaces Sediment accumulation inside the heat exchanger Adjust heat exchanger cleaning device Too high chimney dr...

Страница 18: ...opes during operation can wear out burn out They are available in the shop or at manufacturer Also see fig ECO BURNER UNI MAX 100 1000 kW Pellet Burner Operation Manual The heat exchanger door rotatio...

Страница 19: ...manufacturer s fault Burner guarantee service rules are described in ECO BURNER UNI MAX 100 1000 kW Pellet Burner User Manual In the case of boiler malfunction call by phone and when the firm s repres...

Страница 20: ...e of malfunction we recommend the following contacts Company Address Telephone Manufacturer Kalvis UAB Pramon s 15 LT 78137 iauliai Lithuania Telephone 370 671 88891 E mail prekyba kalvis lt Guarantee...

Отзывы: